Project W-320, 241-C-106 sluicing: Piping calculations. Volume 8
This supporting document has been prepared to make the FDNW calculations for Project W-320 readily retrievable. The objective of this calculation is to perform the hydraulic analysis on the slurry line and the supernate line for W-320. This calculation will use the As-Built conditions of the slurry line and the supernate line. Booster Pump Curves vs System Curves shall be generated for the supernate system and the slurry system.
- Research Organization:
- Fluor Daniel Hanford, Inc., Richland, WA (United States)
- Sponsoring Organization:
- USDOE Office of Environmental Restoration and Waste Management, Washington, DC (United States)
- DOE Contract Number:
- AC06-96RL13200
- OSTI ID:
- 345011
- Report Number(s):
- HNF-2478; ON: DE99050869; BR: EW3130010; TRN: 99:004889
- Resource Relation:
- Other Information: PBD: 24 Jul 1998
- Country of Publication:
- United States
- Language:
- English
Similar Records
Project W-320, 241-C-106 sluicing: Piping calculations. Volume 4
Project W-320, 241-C-106 sluicing: Piping calculations. Volume 2
Project W-320, 241-C-106 sluicing: Piping calculations. Volume 3
Technical Report
·
Fri Jul 24 00:00:00 EDT 1998
·
OSTI ID:345011
Project W-320, 241-C-106 sluicing: Piping calculations. Volume 2
Technical Report
·
Sat Jul 25 00:00:00 EDT 1998
·
OSTI ID:345011
Project W-320, 241-C-106 sluicing: Piping calculations. Volume 3
Technical Report
·
Sat Jul 25 00:00:00 EDT 1998
·
OSTI ID:345011