Project W-320, 241-C-106 sluicing: Piping calculations. Volume 2
This supporting document has been prepared to make the FDNW calculations for Project W-320 readily retrievable. The objectives of this calculation are (1) To perform static and Safety Class 2 dynamic stress analysis of the Slurry and Supernate Process (inner) piping connecting Tanks 241-C-106 and 241-AY-102 in order to be in compliance with the Code requirements; (2) To assure the thermal expansion of the process pipe not be strained by the outer encasement pipe; and (3) To furnish process pipe support to the Civil Engineering group.
- Research Organization:
- Fluor Daniel Hanford, Inc., Richland, WA (United States)
- Sponsoring Organization:
- USDOE Office of Environmental Restoration and Waste Management, Washington, DC (United States)
- DOE Contract Number:
- AC06-96RL13200
- OSTI ID:
- 345002
- Report Number(s):
- HNF-2472; ON: DE99050858; BR: EW3130010; TRN: 99:004880
- Resource Relation:
- Other Information: PBD: 25 Jul 1998
- Country of Publication:
- United States
- Language:
- English
Similar Records
Project W-320, 241-C-106 sluicing HVAC calculations, Volume 4
Project W-320, 241-C-106 sluicing: Piping calculations. Volume 4
Project W-320, 241-C-106 sluicing: Piping calculations. Volume 8
Technical Report
·
Thu Jul 30 00:00:00 EDT 1998
·
OSTI ID:345002
Project W-320, 241-C-106 sluicing: Piping calculations. Volume 4
Technical Report
·
Fri Jul 24 00:00:00 EDT 1998
·
OSTI ID:345002
Project W-320, 241-C-106 sluicing: Piping calculations. Volume 8
Technical Report
·
Fri Jul 24 00:00:00 EDT 1998
·
OSTI ID:345002