Improvements to the Recycler/Main Injector to Deliver 850 kW+
- Fermilab
- Michigan State U.; Lancaster U.; Cockcroft Inst. Accel. Sci. Tech.
The Main Injector is used to deliver a 120 GeV high power proton beam for Neutrino experiments. The design power of 700 kW was reached in early 2017 but further improvements have seen a new sustained peak power of 893 kW. Two of the main improvements include the shortening of the Main Injector ramp length as well optimizing the slip-stacking procedure performed in the Recycler to reduce the amount of uncaptured beam making its way into the Main Injector. These improvements will be discussed in this paper as well future upgrades to reach higher beam powers.
- Research Organization:
- Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States)
- Sponsoring Organization:
- USDOE Office of Science (SC), High Energy Physics (HEP)
- DOE Contract Number:
- AC02-07CH11359
- OSTI ID:
- 1909888
- Report Number(s):
- FERMILAB-CONF-22-106-AD; oai:inspirehep.net:2614713
- Journal Information:
- JACoW, Vol. NAPAC2022
- Country of Publication:
- United States
- Language:
- English
Similar Records
Fermilab Main Injector and Recycler Operations in the Megawatt Era
Fermilab Main Injector and Recycler Operations in the Megawatt Era
High intensity operation using proton stacking in the Fermilab Recycler to deliver 700 kW of 120 GeV proton beam
Conference
·
Thu Oct 05 00:00:00 EDT 2023
·
OSTI ID:1909888
Fermilab Main Injector and Recycler Operations in the Megawatt Era
Conference
·
Tue Oct 03 00:00:00 EDT 2023
·
OSTI ID:1909888
High intensity operation using proton stacking in the Fermilab Recycler to deliver 700 kW of 120 GeV proton beam
Journal Article
·
Tue Dec 15 00:00:00 EST 2020
· Physical Review Accelerators and Beams
·
OSTI ID:1909888
+6 more