High intensity operation using proton stacking in the Fermilab Recycler to deliver 700 kW of 120 GeV proton beam
Journal Article
·
· Physical Review Accelerators and Beams
As part of the NOvA upgrades in 2012, the Recycler was repurposed as a proton stacker for the Main Injector with the aim to deliver 700 kW. Since January 2017, this design power has been run routinely. The steps taken to commission the Recycler and run at 700 kW operationally will be discussed. Major improvements include a new collimation system to control transverse losses and diode damper system to damp the resistive wall instability during slip-stacking. Plans for future running will also be discussed.
- Research Organization:
- Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States)
- Sponsoring Organization:
- USDOE Office of Science (SC), High Energy Physics (HEP)
- Grant/Contract Number:
- AC02-07CH11359
- OSTI ID:
- 1735777
- Alternate ID(s):
- OSTI ID: 1778672
- Report Number(s):
- FERMILAB-PUB-20-685-AD; PRABCJ; 121002
- Journal Information:
- Physical Review Accelerators and Beams, Journal Name: Physical Review Accelerators and Beams Vol. 23 Journal Issue: 12; ISSN 2469-9888
- Publisher:
- American Physical SocietyCopyright Statement
- Country of Publication:
- United States
- Language:
- English
Fermilab main injector: High intensity operation and beam loss control
|
journal | July 2013 |
Recent operation of the FNAL magnetron H− ion source
|
conference | January 2017 |
The NuMI neutrino beam
|
journal | January 2016 |
Coupled-beam and coupled-bunch instabilities
|
journal | November 2018 |
High intensity space charge effects on slip stacked beam in the Fermilab Recycler
|
journal | February 2019 |
Fermilab Recycler Ring BPM Upgrade Based on Digital Receiver Technology
|
conference | January 2004 |
Commissioning and first results of the Fermilab Muon Campus
|
journal | January 2019 |
A new slip stacking RF system for a twofold power upgrade of Fermilab׳s Accelerator Complex
|
journal | September 2014 |
Fast instability caused by electron cloud in combined function magnets
|
journal | April 2017 |
Similar Records
High Intensity Proton Stacking at Fermilab: 700 kW Running
700 kW Main Injector Operations for NOvA at FNAL
Reuse Recycler: High Intensity Proton Stacking at Fermilab
Conference
·
Sun Jul 01 00:00:00 EDT 2018
·
OSTI ID:1735777
+6 more
700 kW Main Injector Operations for NOvA at FNAL
Conference
·
Mon Jun 01 00:00:00 EDT 2015
·
OSTI ID:1735777
Reuse Recycler: High Intensity Proton Stacking at Fermilab
Conference
·
Sun Jul 17 00:00:00 EDT 2016
·
OSTI ID:1735777