High Intensity Proton Stacking at Fermilab: 700 kW Running
- Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States)
As part of the Nova upgrades in 2012, the Recycler was repurposed as proton stacker for the Main Injector with the aim to deliver 700 kW. Since January 2017, this design power has been run routinely. The steps taken to commission the Recycler and run at 700 kW operationally will be discussed as well as plans for future running.
- Research Organization:
- Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States)
- Sponsoring Organization:
- USDOE Office of Science (SC), High Energy Physics (HEP)
- DOE Contract Number:
- AC02-07CH11359
- OSTI ID:
- 1463617
- Report Number(s):
- FERMILAB-CONF-18-262-AD; 1685454
- Resource Relation:
- Conference: 61st ICFA Advanced Beam Dynamics Workshop on High-Intensity and High-Brightness Hadron Beams, Daejeon (Korea), 17-22 Jun 2018
- Country of Publication:
- United States
- Language:
- English
Similar Records
High intensity operation using proton stacking in the Fermilab Recycler to deliver 700 kW of 120 GeV proton beam
700 kW Main Injector Operations for NOvA at FNAL
High Intensity Proton Stacking at Fermilab: 700 kW Running [Slides]
Journal Article
·
Tue Dec 15 00:00:00 EST 2020
· Physical Review Accelerators and Beams
·
OSTI ID:1463617
+6 more
700 kW Main Injector Operations for NOvA at FNAL
Conference
·
Mon Jun 01 00:00:00 EDT 2015
·
OSTI ID:1463617
High Intensity Proton Stacking at Fermilab: 700 kW Running [Slides]
Technical Report
·
Tue Jun 19 00:00:00 EDT 2018
·
OSTI ID:1463617