skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: BCP selector valves and limit switches

Technical Report ·
DOI:https://doi.org/10.2172/10191639· OSTI ID:10191639

This document contains information about the Acceptance Test Procedure to demonstrate that the electrical/instrumentation systems for the BCP stream function as required by project criteria. Topics discussed include: References to engineering drawings and specifications; responsibilities of the project engineer, test director, records recorder, test operator, design engineer, and project manager; occupational safety and health; test performance; and what to do with exceptions.

Research Organization:
Westinghouse Hanford Co., Richland, WA (United States)
Sponsoring Organization:
USDOE, Washington, DC (United States)
DOE Contract Number:
AC06-87RL10930
OSTI ID:
10191639
Report Number(s):
WHC-SD-W007H-ATP-001; ON: DE95002085; BR: 35AF11201/35AF11202
Resource Relation:
Other Information: PBD: 30 Sep 1994
Country of Publication:
United States
Language:
English