skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: BCP selector valves and limit switches

Technical Report ·
DOI:https://doi.org/10.2172/10114614· OSTI ID:10114614

This Acceptance Test Procedure (ATP) has been prepared to demonstrate that the Electrical/Instrumentation systems for the BCP stream function as required by project criteria. Specifically, the test will verify the operation of the solenoid valves and associated limit switches installed for the BCP portion of W-OO7H. This equipment is part of the B-Plant Process Condensate Treatment Facility.

Research Organization:
Westinghouse Hanford Co., Richland, WA (United States)
Sponsoring Organization:
USDOE, Washington, DC (United States)
DOE Contract Number:
AC06-87RL10930
OSTI ID:
10114614
Report Number(s):
WHC-SD-W007H-ATR-001; ON: DE95005650; BR: 35AF11201/35AF11202; TRN: AHC29507%%34
Resource Relation:
Other Information: PBD: 9 Jan 1995
Country of Publication:
United States
Language:
English