Proposed construction of Priest Rapids Dam in relation to Hanford Works
This paper summarizes the proposed construction of the Priest Rapids Dam on the Columbia River by the Atomic Energy Commission. Power generation to the Hanford Works and flood control for the surrounding area is the main goal for the construction of the dam. The summary covers the feasibility of the dam from its design, operation, benefits, security, drawbacks, etc.
- Research Organization:
- Hanford Site (HNF), Richland, WA (United States)
- Sponsoring Organization:
- USDOE, Washington, DC (United States)
- DOE Contract Number:
- AC06-76RL01830
- OSTI ID:
- 10137016
- Report Number(s):
- HAN-48422; ON: DE92011314
- Resource Relation:
- Other Information: PBD: 7 Jan 1953
- Country of Publication:
- United States
- Language:
- English
Similar Records
Effect of low river flows on the operation of Hanford production works resulting from operation of the proposed Priest Rapids Dam
Unsteady flow model of Priest Rapids Dam releases at Hanford Reach, Columbia River, Washington
Update of Columbia River flow and temperature data measured at Priest Rapids Dam and Vernita Bridge
Technical Report
·
Mon Oct 10 00:00:00 EDT 1955
·
OSTI ID:10137016
Unsteady flow model of Priest Rapids Dam releases at Hanford Reach, Columbia River, Washington
Technical Report
·
Tue Feb 01 00:00:00 EST 1983
·
OSTI ID:10137016
Update of Columbia River flow and temperature data measured at Priest Rapids Dam and Vernita Bridge
Technical Report
·
Thu Sep 01 00:00:00 EDT 1983
·
OSTI ID:10137016