Title: CHALLENGES AND OPPORTUNITIES--INTEGRATED LIFE-CYCLE OPTIMIZATION INITIATIVES FOR THE HANFORD RIVER PROTECTION PROJECT--WASTE TREATMENT PLANT

Conference ·
OSTI ID:832983

This paper describes the ongoing integrated life-cycle optimization efforts to achieve both design flexibility and design stability for activities associated with the Waste Treatment Plant at Hanford. Design flexibility is required to support the Department of Energy Office of River Protection Balance of Mission objectives, and design stability to meet the Waste Treatment Plant construction and commissioning requirements in order to produce first glass in 2007. The Waste Treatment Plant is a large complex project that is driven by both technology and contractual requirements. It is also part of a larger overall mission, as a component of the River Protection Project, which is driven by programmatic requirements and regulatory, legal, and fiscal constraints. These issues are further complicated by the fact that both of the major contractors involved have a different contract type with DOE, and neither has a contract with the other. This combination of technical and programmatic drivers, constraints, and requirements will continue to provide challenges and opportunities for improvement and optimization. The Bechtel National, Inc. team is under contract to engineer, procure, construct, commission and test the Waste Treatment Plant on or ahead of schedule, at or under cost, and with a throughput capacity equal to or better than specified. The Department of Energy is tasked with the long term mission of waste retrieval, treatment, and disposal. While each mission is a compliment and inextricably linked to one another, they are also at opposite ends of the spectrum, in terms of expectations of one another. These mission requirements, that are seemingly in opposition to one another, pose the single largest challenge and opportunity for optimization: one of balance. While it is recognized that design maturation and optimization are the normal responsibility of any engineering firm responsible for any given project, the aspects of integrating requirements and the management of issues across contract boundaries is a more difficult matter. This aspect, one of a seamless systems approach to the treatment of tank wastes at the Hanford site, is the focus of the Optimization Studies. This ''big O''Optimization of Life-Cycle operations is what is meant when the term ''optimization'' is used on the River Protection Project and initiatives cited in this paper. From the early contractor centric methods and processes used to move toward an integrated solution, through extensive partnering approaches, to the current quality initiatives with multi-organizational participation, significant progress is being made towards achieving the goal of truly integrated life-cycle optimization for the Department of Energy's River Protection Project and Waste Treatment Plant.

Research Organization:
Bechtel National, Inc. 3000 George Washington Way, MS4-C1, Richland, WA (US)
Sponsoring Organization:
US Department of Energy (US)
OSTI ID:
832983
Resource Relation:
Conference: Waste Management 2002 Symposium, Tucson, AZ (US), 02/24/2002--02/28/2002; Other Information: PBD: 25 Feb 2002