Title: CIM5 Phase III base process development results

Technical Report ·
DOI:https://doi.org/10.2172/752205· OSTI ID:752205

Integrated Demonstration Runs for the Am/Cm vitrification process were initiated in the Coupled 5-inch Cylindrical Induction Melter (CIM5) on 11/30/98 and completed on 12/9/98. Four successful runs at 60 wt% lanthanide loading were completed which met or exceeded all established criteria. The operating parameters used in these runs established the base conditions for the 5-inch Cylindrical Induction Melter (CIM5) process and were summarized in the 5-inch CIM design basis, SRT-AMC-99-OO01. (1) In subsequent tests, a total of fourteen CIM5 runs were performed using various power inputs, ramp rates and target temperatures to define the preferred processing conditions (2) Process stability and process flexibility were the key criteria used in assessing the results for each run. A preferred set of operating parameters was defined for the CIM5 batch process and these conditions were used to generate a pre-programmed, automatic processing cycle that was used for the last six CIM.5 runs (3) These operational tests were successfully completed in the January-February time frame and were summarized in SRT-AMC-99-00584. The recommended set of operating conditions defined in Runs No.1 through No.14 was used as the starting point for further pilot system runs to determine the robustness of the process, evaluate a bubbler, and investigate off-normal conditions. CIM5 Phase III Runs No.15 through No.60 were conducted utilizing the pre-programmed, automatic processing cycle to investigate system performance. This report summarizes the results of these tests and provides a recommendation for the base process as well as a processing modification for minimizing volume expansions if americium and/or curium are subject to a thermal reduction reaction like cerium. This document summarizes the results of the base process development tests conducted in the Am/Cm Pilot Facility located in Building 672-T.

Research Organization:
Savannah River Site (SRS), Aiken, SC (United States)
Sponsoring Organization:
US Department of Energy (US)
DOE Contract Number:
AC09-96SR18500
OSTI ID:
752205
Report Number(s):
WSRC-TR-99-00434-Rev.0; TRN: US0002623
Resource Relation:
Other Information: PBD: 6 Jan 2000
Country of Publication:
United States
Language:
English