Preoperational test report, cross-site transfer water flush system (POTP-001)
This report documents the results of the testing performed per POTP-001, for the Cross-Site Transfer Water Flush System. (HNF-1552, Rev. 0) The Flush System consists of a 47,000 gallon tank (302C), a 20 hp pump, two 498kW heaters, a caustic addition pump, various valves, instruments, and piping. The purpose of this system is to provide flush water at 140 F, 140gpm, and pH 11-12 for the Cross-Site Transfer System operation.
- Sponsoring Organization:
- USDOE Office of Environmental Restoration and Waste Management, Washington, DC (US)
- DOE Contract Number:
- AC06-96RL13200
- OSTI ID:
- 16958
- Report Number(s):
- ON: DE99050523; BR: 39EW31301; ON: DE99050523; BR: 39EW31301; TRN: US0111123
- Resource Relation:
- Other Information: PBD: 20 Feb 1998; Supercedes report DE99050523; PBD: 20 Feb 1998
- Country of Publication:
- United States
- Language:
- English
Similar Records
Preoperational test report, cross-site transfer system integrated test (POTR-007)
Operating test report for project W-417, T-plant steam removal upgrade, waste transfer portion
Cold Vacuum Drying (CVD) Facility Sampling and Analysis Plan
Technical Report
·
Thu Apr 02 00:00:00 EST 1998
·
OSTI ID:16958
Operating test report for project W-417, T-plant steam removal upgrade, waste transfer portion
Technical Report
·
Tue Oct 21 00:00:00 EDT 1997
·
OSTI ID:16958
Cold Vacuum Drying (CVD) Facility Sampling and Analysis Plan
Technical Report
·
Fri Sep 22 00:00:00 EDT 2000
·
OSTI ID:16958