skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Magnetic measurements and tuning of undulators for the APS FEL project.

Conference ·
OSTI ID:11149

Two insertion device magnetic structures have been prepared for the Advanced Photon Source (APS) FEL project [1]. The magnetic structures are standard APS undulatory, 2.4 m long with a 3.3-cm period. Measurements and tuning of the undulatory have been completed at a magnetic gap of about 9.3 mm, where K is 3.1. Special measurement and tuning techniques were used to satisfy the tight trajectory straightness requirement that the second field integral be less than 3.3 kG-cm{sup 2}. The magnetic field strengths of the undulators must be well matched; this leads to the requirement that the magnetic gap must be controlled to better than 10 microns. Proper phasing between the undulatory is ensured by adjusting the length of the drift space between the undulatory. The drift space length that is needed is strongly affected by the end fields of the magnetic structures. The results of measurements of the magnetic field and calculations of the drift length are provided.

Research Organization:
Argonne National Lab., IL (US)
Sponsoring Organization:
US Department of Energy (US)
DOE Contract Number:
W-31109-ENG-38
OSTI ID:
11149
Report Number(s):
ANL/XFD/CP-97755; TRN: US0104318
Resource Relation:
Conference: PAC '99, New York, NY (US), 03/29/1999--04/02/1999; Other Information: PBD: 20 Apr 1999
Country of Publication:
United States
Language:
English