Title: TITLE III EVALUATION REPORT FOR THE SURFACE AND SUBSURFACE POWER SYSTEM

Technical Report ·
DOI:https://doi.org/10.2172/886559· OSTI ID:886559

The objective of this evaluation is to provide recommendations to ensure consistency between the technical baseline requirements, baseline design, and the alternate constructed power system. Recommendations for resolving discrepancies between the alternate constructed power system, the technical baseline requirements, and the baseline design are included in this report. Cost and schedule estimates are provided for all recommended modifications. This report does not address items which do not meet current safety or code requirements. These items are identified to the CMO and immediate action is taken to correct the situation. The report does identify safety and code items for which the A/E is recommending improvements. The recommended improvements will exceed the minimum requirements of applicable code and safety guidelines. These recommendations are intended to improve and enhance the operation and maintenance of the facility. This Title III Evaluation Report (TER) does not include evaluation of surface electrical construction support facilities used to provide temporary construction power where the intent to remove such facilities when construction is completed such as tent storage buildings, shop buildings, fuel storage area etc. Furthermore, this TER does not include the extension of the existing overhead power lines to the booster pump station that was designed, installed, and is maintained by Nevada Test Site (NTS).

Research Organization:
Yucca Mountain Project, Las Vegas, NV (United States)
Sponsoring Organization:
USDOE
DOE Contract Number:
AC08-91RW00134
OSTI ID:
886559
Report Number(s):
BAB000000-01717-5705-00015 REV 00; MOL.19991022.0191 DC#23433; TRN: US200616%%1081
Country of Publication:
United States
Language:
English

Similar Records

TITLE III EVALUATION REPORT FOR THE SUBSURFACE LIGHTING SYSTEM
Technical Report · Wed Sep 09 00:00:00 EDT 1998 · OSTI ID:886559

Title III Evaluation Report for the Muck Storage
Technical Report · Thu Aug 13 00:00:00 EDT 1998 · OSTI ID:886559

Title III Evaluation for the Access Road System
Technical Report · Tue Jul 28 00:00:00 EDT 1998 · OSTI ID:886559