Human-factors engineering-control-room design review: Shoreham Nuclear Power Station. Draft audit report
A human factors engineering preliminary design review of the Shoreham control room was performed at the site on March 30 through April 3, 1981. This design review was carried out by a team from the Human Factors Engineering Branch, Division of Human Factors Safety. This report was prepared on the basis of the HFEB's review of the applicant's Preliminary Design Assessment and the human factors engineering design review/audit performed at the site. The presented sections are numbered to conform to the guidelines of the draft version of NUREG-0700. They summarize the teams's observations of the control room design and layout, and of the control room operators' interface with the control room environment.
- Research Organization:
- SEE CODE- 9513035 California Univ., Livermore (USA). Lawrence Livermore Lab.
- DOE Contract Number:
- W-7405-ENG-48
- OSTI ID:
- 5639979
- Report Number(s):
- UCID-19122; ON: DE82007851; TRN: 82-010577
- Country of Publication:
- United States
- Language:
- English
Similar Records
Draft audit report, human factors engineering control room design review: Saint Lucie Nuclear Power Plant, Unit No. 2
Human-factors control-room-design review draft audit report: Detroit Edison Company, Enrico Fermi Atomic Power Plant--Unit 2
Related Subjects
21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS
SHOREHAM REACTOR
CONTROL ROOMS
CONSOLES
DISPLAY DEVICES
REACTOR CONTROL SYSTEMS
REACTOR OPERATORS
BWR TYPE REACTORS
CONTROL SYSTEMS
ENRICHED URANIUM REACTORS
PERSONNEL
POWER REACTORS
REACTORS
THERMAL REACTORS
WATER COOLED REACTORS
WATER MODERATED REACTORS
220400* - Nuclear Reactor Technology- Control Systems
210100 - Power Reactors
Nonbreeding
Light-Water Moderated
Boiling Water Cooled