skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: R & D on Beam Injection and Bunching Schemes in the Fermilab Booster

Conference ·
OSTI ID:1295406

Fermilab is committed to upgrade its accelerator complex to support HEP experiments at the intensity frontier. The ongoing Proton Improvement Plan (PIP) enables us to reach 700 kW beam power on the NuMI neutrino targets. By the end of the next decade, the current 400 MeV normal conducting LINAC will be replaced by an 800 MeV superconducting LINAC (PIP-II) with an increased beam power >50% of the PIP design goal. Both in PIP and PIP-II era, the existing Booster is going to play a very significant role, at least for next two decades. In the meanwhile, we have recently developed an innovative beam injection and bunching scheme for the Booster called "early injection scheme" that continues to use the existing 400 MeV LINAC and implemented into operation. This scheme has the potential to increase the Booster beam intensity by >40% from the PIP design goal. Some benefits from the scheme have already been seen. In this paper, I will describe the basic principle of the scheme, results from recent beam experiments, our experience with the new scheme in operation, current status, issues and future plans. This scheme fits well with the current and future intensity upgrade programs at Fermilab.

Research Organization:
Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States)
Sponsoring Organization:
USDOE Office of Science (SC), High Energy Physics (HEP)
DOE Contract Number:
AC02-07CH11359
OSTI ID:
1295406
Report Number(s):
FERMILAB-CONF-16-246-AD; 1480809
Resource Relation:
Conference: 57th ICFA Advanced Beam Dynamics Workshop on High-Intensity and High-Brightness Hadron Beams, Malmo, Sweden, 07/03-07/08/2016
Country of Publication:
United States
Language:
English

Similar Records

Early Beam Injection Scheme for the Fermilab Booster: A Path for Intensity Upgrade
Conference · Wed Oct 28 00:00:00 EDT 2015 · OSTI ID:1295406

Proton Beam Intensity Upgrades for the Neutrino Program at Fermilab
Conference · Thu Dec 15 00:00:00 EST 2016 · Proceedings of Science · OSTI ID:1295406

Fermilab Accelerator Complex: Status and Improvement Plans
Technical Report · Mon Dec 03 00:00:00 EST 2018 · OSTI ID:1295406

Related Subjects