Priority evaluation and ranking of transmission system projects computer models and results
- Centro de Pesquisas de Energia Eletrica Caixa Postal 2754 Rio de Janeiro (BR)
- Pontificia Universidade Catolica Rua Marques de Sao Vincente, 255 Rio de Janeiro (BR)
- Companhia Energitica de Sao Paulo, Av. Angelica, 2565 San Paulo (BR)
One of the consequences of the severe economic crisis which has affected Brazil in the past years has been a substantial reduction in the available resources for power system investments. If budget is constrained below the ideal investment level, the problem of defining which generation and/or transmission investments should be postponed becomes very important. The objective of this paper is to describe a methodology for identifying which subset of transmission investments in a given expansion plan can be postponed in order to meet a preestablished budget constraint with the least possible impact on system performance. The methodology is based on the ranking of scheduled reinforcements by a cost/benefit index. The cost corresponds to the deterioration of operating conditions (e.g. increased risk of load curtailment) if the equipment is postponed.
- OSTI ID:
- 6527427
- Journal Information:
- IEEE Transactions on Power Systems (Institute of Electrical and Electronics Engineers); (USA), Vol. 5:3; ISSN 0885-8950
- Country of Publication:
- United States
- Language:
- English
Similar Records
Marine Hydrokinetic Energy Site Identification and Ranking Methodology Part I: Wave Energy
Application of sensitivity analysis of load supplying capability to interactive transmission expansion planning