Title: Priority evaluation and ranking of transmission system projects computer models and results

Journal Article · · IEEE Transactions on Power Systems (Institute of Electrical and Electronics Engineers); (USA)
DOI:https://doi.org/10.1109/59.65933· OSTI ID:6527427
; ;  [1];  [2];  [3]
  1. Centro de Pesquisas de Energia Eletrica Caixa Postal 2754 Rio de Janeiro (BR)
  2. Pontificia Universidade Catolica Rua Marques de Sao Vincente, 255 Rio de Janeiro (BR)
  3. Companhia Energitica de Sao Paulo, Av. Angelica, 2565 San Paulo (BR)

One of the consequences of the severe economic crisis which has affected Brazil in the past years has been a substantial reduction in the available resources for power system investments. If budget is constrained below the ideal investment level, the problem of defining which generation and/or transmission investments should be postponed becomes very important. The objective of this paper is to describe a methodology for identifying which subset of transmission investments in a given expansion plan can be postponed in order to meet a preestablished budget constraint with the least possible impact on system performance. The methodology is based on the ranking of scheduled reinforcements by a cost/benefit index. The cost corresponds to the deterioration of operating conditions (e.g. increased risk of load curtailment) if the equipment is postponed.