Production optimization in the Provincia field, Colombia
Designing or redesigning production facilities for optimum operation usually results in the generation of maximum profit from an installation. But in older fields, or fields where a short life is expected, design changes may not be a viable option. In such cases, obtaining maximum production within the limits of existing facilities, thereby minimizing new investments, may be an attractive option. This paper discusses application of the latter technique in the Provincia field, Colombia, to optimize oil and gas production within constraints imposed by periodic temporary gas-compression-capacity restrictions and by the configuration of existing oil and gas facilities. The multistep optimization program used at Provincia included improvement of individual well performance, optimization of individual well facilities, fieldwide optimization of surface facilities, and optimization of the field production scheme.
- Research Organization:
- Exxon Production Research Co. (US); Mobil R and D Corp., Dallas, TX (US); Esso Colombiana Ltd. (CO)
- OSTI ID:
- 6133774
- Journal Information:
- SPE (Society of Petroleum Engineers) Product. Eng.; (United States), Vol. 4:1
- Country of Publication:
- United States
- Language:
- English
Similar Records
Subtask 1.3 – Integrated Carbon Capture and Storage for North Dakota Ethanol Production
Low Temperature Geothermal Play Fairway Analysis For The Appalachian Basin: Phase 1 Revised Report November 18, 2016
Related Subjects
03 NATURAL GAS
COLOMBIA
OIL FIELDS
NATURAL GAS FIELDS
PRODUCTIVITY
NATURAL GAS WELLS
OPTIMIZATION
OIL WELLS
DESIGN
INSTALLATION
PERFORMANCE
GEOLOGIC DEPOSITS
LATIN AMERICA
MINERAL RESOURCES
NATURAL GAS DEPOSITS
PETROLEUM DEPOSITS
RESOURCES
SOUTH AMERICA
WELLS
020300* - Petroleum- Drilling & Production
030300 - Natural Gas- Drilling
Production
& Processing