skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Drilling and completion specifications for CA series multilevel piezometers

Technical Report ·
DOI:https://doi.org/10.2172/5234962· OSTI ID:5234962

CX Series multilevel piezometer boreholes will provide information on hydraulic heads in the Rosalia, Sentinel Gap, Ginkgo, Rocky Coulee, Cohassett, Birkett, and Umtanum flow tops. The borehole sites will be located adjacent to the reference repository location. In addition, information from the boreholes will provide input data used to determine horizontal and vertical flow rates, and identify possible geologic structures. This specification includes details for drilling, piezometer design, hydrologic testing, and hydrochemical sampling of the boreholes. It includes drilling requirements, design, and installation procedures for the series piezometer nests, intervals selected for head monitoring and schedules for drilling and piezometer installation. Specific drilling and piezometer installation specifications for boreholes DC-24CX and DC-25CX are also included. 27 refs., 5 figs., 3 tabs.

Research Organization:
Rockwell International Corp., Richland, WA (United States). Rockwell Hanford Operations
Sponsoring Organization:
DOE/RW
DOE Contract Number:
AC06-77RL01030
OSTI ID:
5234962
Report Number(s):
RHO-BWI-SS-006; ON: TI90004900; TRN: 90-003075
Country of Publication:
United States
Language:
English