Discussion of ``Retrofit of air pollution control equipment at the SPSA/Navy power plant``
Conference
·
OSTI ID:442649
This paper reviews problems that occurred in retrofitting existing facilities. The authors are asked to identify the actual downtime required from the beginning of construction to the start-up operation on the MSW and to provide the lost revenue from MSW processing and energy during the construction of each boiler. More information is requested on safety problems.
- OSTI ID:
- 442649
- Report Number(s):
- CONF-960345-; ISBN 0-7918-1227-8; TRN: IM9712%%74
- Resource Relation:
- Conference: 17. biennial conference of the Solid Waste Processing Division of the American Society of Mechanical Engineers and 4th North American waste-to-energy conference, Atlantic City, NJ (United States), 31 Mar - 3 Apr 1996; Other Information: PBD: 1996; Related Information: Is Part Of 17. biennial waste processing conference: Proceedings. Supplement -- discussions; PB: 123 p.
- Country of Publication:
- United States
- Language:
- English
Similar Records
Retrofit of air pollution control equipment at the SPSA/Navy power plant
Air pollution retrofit study: emission control for oil-fired power plants in the South Coast Air Basin
Advanced underground Vehicle Power and Control: The locomotive Research Platform
Conference
·
Sun Sep 01 00:00:00 EDT 1996
·
OSTI ID:442649
Air pollution retrofit study: emission control for oil-fired power plants in the South Coast Air Basin
Book
·
Mon Jan 01 00:00:00 EST 1979
·
OSTI ID:442649
Advanced underground Vehicle Power and Control: The locomotive Research Platform
Technical Report
·
Tue Jan 28 00:00:00 EST 2003
·
OSTI ID:442649