skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Cryogenic supply for accelerators and experiments at FAIR

Journal Article · · AIP Conference Proceedings
DOI:https://doi.org/10.1063/1.4860842· OSTI ID:22262719
; ; ; ;  [1]
  1. GSI Helmholtzzentrum für Schwerionenforschung GmbH, Planckstraße 1,64291 Darmstadt (Germany)

In the coming years the new international accelerator facility FAIR (Facility for Antiproton and Ion Research), one of the largest research projects worldwide, will be built at GSI. In the final construction FAIR consists of synchrotrons and storage rings with up to 1,100 meters in circumference, two linear accelerators and about 3.5 kilometers beam transfer lines. The existing GSI accelerators serve as pre-accelerators. Partly the new machines will consist of superconducting magnets and therefore require a reliable supply with liquid helium. As the requirements for the magnets is depending on the machine and have a high variety, the cooling system is different for each machine; two phase cooling, forced flow cooling and bath cooling respectively. In addition the cold mass of the individual magnets varies between less than 1t up to 80t and some magnets will cause a dynamic heat load due to ramping that is higher than the static loads. The full cryogenic system will be operated above atmospheric pressure. The refrigeration and liquefaction power will be provided by two main cryogenic plants of 8 and 25 kW at 4K and two smaller plants next to the experiments.

OSTI ID:
22262719
Journal Information:
AIP Conference Proceedings, Vol. 1573, Issue 1; Conference: Cryogenic engineering conference, Anchorage, AK (United States), 17-21 Jun 2013; Other Information: (c) 2014 AIP Publishing LLC; Country of input: International Atomic Energy Agency (IAEA); ISSN 0094-243X
Country of Publication:
United States
Language:
English

Similar Records

Cryogenic System for the New International Accelerator Facility for Research with Ions and Antiprotons at GSI
Journal Article · Wed Jun 23 00:00:00 EDT 2004 · AIP Conference Proceedings · OSTI ID:22262719

Beam Diagnostics Challenges in the FAIR Project at GSI
Journal Article · Mon Nov 20 00:00:00 EST 2006 · AIP Conference Proceedings · OSTI ID:22262719

Facility for Antiproton and Ion Research, FAIR, at the GSI site
Journal Article · Fri Nov 17 00:00:00 EST 2006 · AIP Conference Proceedings · OSTI ID:22262719