Title: Forward-Looking State-of-the-Art Review on Earned Value Management Systems: The Disconnect between Academia and Industry

Journal Article · · Journal of Management in Engineering

Earned value management (EVM) is a project management approach that can enhance the probability of project success. It is applied widely across different industry sectors (e.g., energy, aerospace, construction, defense, and manufacturing), generally through the use of an earned value management system (EVMS). A holistic and up-to-date literature review on EVM and EVMS does not exist. A literature review can provide a comprehensive perspective on the topic, identifying and summarizing the existing body of knowledge, as a foundation to advance the state of practice of EVM/EVMS. Therefore, the objective of this paper is to investigate the EVM/EVMS state of the art by critically reviewing academic and industry publications, with a specific focus on the maturity of EVMS and the environment surrounding its implementation. By performing a systematic literature review, the authors identified 600 publications since the inception of the EVM concept in 1962, and then narrowed down this list to 160 relevant publications from the last decade for closer review. The findings include the discovery of eight emergent themes. Of these themes, “forecasting/prediction” constitutes the largest portion of the recent literature, followed by “application of EVMS.” One interesting finding is that EVMS maturity, although being a critical topic, is only discussed in one publication. Publications focused on EVM/EVMS have increased in the last decade and significant differences were found between academia and industry literature in terms of the limitations and extensions of EVM/EVMS, EVMS environment, and compliance. A key finding is that designing a reliable EVMS should combine both technical and social aspects of implementation. This forward-looking paper provides a state-of-the-art review while highlighting gaps in the existing EVM/EVMS body of knowledge and introducing new perspectives to support EVMS research and application.

Research Organization:
Arizona State University, Tempe, AZ (United States)
Sponsoring Organization:
USDOE
OSTI ID:
1982349
Journal Information:
Journal of Management in Engineering, Journal Name: Journal of Management in Engineering Journal Issue: 3 Vol. 38; ISSN 0742-597X
Publisher:
American Society of Civil Engineers (ASCE)Copyright Statement
Country of Publication:
United States
Language:
English

References (74)

History, Practices, and Future of Earned Value Management in Government: Perspectives from NASA journal February 2012
Implementing earned value management using bridge information modeling journal May 2014
A model for effective implementation of Earned Value Management methodology journal July 2003
Project maturity in organisations journal August 2003
Improved cost monitoring and control through the Earned Value Management System journal January 2014
Management of construction cost contingency covering upside and downside risks journal December 2014
Earned Schedule min-max: Two new EVM metrics for monitoring and controlling projects journal July 2019
Integrated project delivery with BIM: An automated EVM-based approach journal October 2019
Z-number based earned value management (ZEVM): A novel pragmatic contribution towards a possibilistic cost-duration assessment journal May 2020
A multivariate approach for top-down project control using earned value management journal November 2015
A buffer control method for top-down project control journal October 2017
The impact of a limited budget on the corrective action taking process journal November 2020
A comparison of the performance of various project control methods using earned value management systems journal April 2015
A comparative study of Artificial Intelligence methods for project duration forecasting journal March 2016
An extension of the EVM analysis for project monitoring: The Cost Control Index and the Schedule Control Index journal July 2011
EDM: Earned Duration Management, a new approach to schedule performance management and measurement journal August 2014
An Earned Schedule-based regression model to improve cost estimate at completion journal August 2014
Construction and evaluation framework for a real-life project database journal April 2015
Evaluation of deterministic state-of-the-art forecasting approaches for project duration based on earned value management journal October 2015
Classification of articles and journals on project control and earned value management journal October 2015
Improving project forecast accuracy by integrating earned value management with exponential smoothing and reference class forecasting journal January 2017
Extensions of earned value management: Using the earned incentive metric to improve signal quality journal February 2017
Conditions of success for earned value analysis in projects journal April 2018
Socio-technical systems: From design methods to systems engineering journal January 2011
Quality: The Third Element of Earned Value Management journal January 2015
Improving Construction Management of an Educational Center by Applying Earned Value Technique journal January 2011
Project Control Based on a Mutual Application of Pert and Earned Value Management Methods journal January 2016
What literature review is not: diversity, boundaries and recommendations journal May 2014
Alignment during Preproject Planning journal April 2001
Probabilistic Forecasting of Project Duration Using Kalman Filter and the Earned Value Method journal August 2010
Combination of Project Cost Forecasts in Earned Value Management journal November 2011
Sensitivity of Earned Value Schedule Forecasting to S-Curve Patterns journal July 2014
Developing a Novel Framework to Manage Schedule Contingency Using Theory of Constraints and Earned Schedule Method journal April 2018
Estimating Cumulative Damages due to Disruptions in Repetitive Construction journal November 2016
Estimated Cost at Completion: Integrating Risk into Earned Value Management journal March 2017
Developing a Quality-Embedded EVM Tool to Facilitate the Iron Triangle in Architectural, Construction, and Engineering Practices journal September 2018
Applying and Assessing Performance of Earned Duration Management Control Charts for EPC Project Duration Monitoring journal March 2020
Dynamic Control Thresholds for Consistent Earned Value Analysis and Reliable Early Warning journal September 2015
Project Completion Time and Cost Prediction Using Change Point Analysis journal September 2015
Probabilistic Evaluation of Cost Performance Stability in Earned Value Management journal January 2016
Project Duration Forecasting Using Earned Duration Management with Exponential Smoothing Techniques journal January 2017
Implementation of Earned Value Management in Unit-Price Payment Contracts journal May 2017
System Dynamics Approach for Forecasting Performance of Construction Projects journal January 2018
What CPI = 0.85 Really Means: A Probabilistic Extension of the Estimate at Completion journal March 2019
Quantifying FEED Maturity and Its Impact on Project Performance in Large Industrial Projects journal September 2019
Critical Factors for Improving Reliability of Project Control Metrics throughout Project Life Cycle journal January 2020
Integrating Corrective Actions in Project Time Forecasting Using Exponential Smoothing journal September 2020
Earned Value Management System State of Practice: Identifying Critical Subprocesses, Challenges, and Environment Factors of a High-Performing EVMS journal July 2021
EVMS for Nuclear Power Plant Construction: Variables for Theory and Implementation conference June 2011
An Analytic Review of Earned Value Management Studies in the Construction Industry conference May 2012
Integrating BIM and Earned Value Management System to Measure Construction Progress conference March 2018
Synthesis of Improvements to EVMS Key Parameters Representation conference March 2018
Risk Management and the Effects on Project Success conference March 2018
Earned Value Management System (EVMS) Reliability: A Review of Existing EVMS Literature conference November 2020
The Costs and Benefits of the Earned Value Management Process journal November 1998
Come back sociotechnical systems theory, all is forgiven … journal April 2015
Exploring earned value management in the Spanish construction industry as a pathway to competitive advantage journal April 2018
The Factors Affecting on Earned Value Management journal August 2020
Measuring the Impact of Scope Changes on Project Plan Using EVM journal January 2020
Earned Value Management: Transitioning from discouragement to a glimmer of hope conference March 2012
Navigating an earned value management validation led by NASA: A contractor's perspective and helpful hints conference March 2017
So you Passed an Earned Value Management Government Validation - Now What? conference March 2019
Using a Socio-Technical Systems Approach for a Sales Process Improvement conference October 2018
Recommended Steps for Thematic Synthesis in Software Engineering conference September 2011
Use of Earned Value Management in the UAE Construction Industry conference May 2016
Project Management Model: Integrating Earned Schedule, Quality, and Risk in Earned Value Management conference April 2019
A New Fuzzy Approach for Project Time Assessment Under Uncertain Conditions conference January 2019
Earned Scope Management: A Case of Study of Scope Performance Using COSMIC (ISO 19761) with a Real Project
  • Valdes-Souto, Francisco
  • 2016 Joint Conference of the International Workshop on Software Measurement and the International Conference on Software Process and Product Measurement (IWSM-MENSURA) https://doi.org/10.1109/IWSM-Mensura.2016.019
conference October 2016
Applying EVM in a Software Company: Benefits and Difficulties conference September 2013
Grey Earned Value Management: Theory and Applications journal December 2021
Implementation of Earned Value Management Tools in the Wendelstein 7-X Project journal December 2012
Scheduling simulation-based techniques for earned value management on resource-constrained schedules under delayed scenarios conference December 2011
Critical factors and Benefits in the use of Earned Value Management in construction
  • Netto, Joaquim Teixeira; De Oliveira, Nylvandir Liberato Fernandes; Freitas, Andrey Pimentel Aleluia
  • Brazilian Journal of Operations & Production Management, Vol. 17, Issue 1 https://doi.org/10.14488/BJOPM.2020.007
journal February 2020
Developing Group Leadership and Communication Skills for Monitoring evm in Project Management journal July 2015

Similar Records

Novel Earned Value Management System Maturity Framework and Its Relation to Project Performance
Journal Article · Tue Mar 28 00:00:00 UTC 2023 · Journal of Construction Engineering and Management · OSTI ID:2424546

An Effective Earned Value Management System (EVMS) is a Team Sport
Journal Article · Thu Feb 15 00:00:00 UTC 2024 · Project Management Journal · OSTI ID:2305752

Earned Value Management Systems for Operations Activities
Technical Report · Thu Jul 28 04:00:00 UTC 2022 · OSTI ID:1878139

Related Subjects