|
History, Practices, and Future of Earned Value Management in Government: Perspectives from NASA
|
journal
|
February 2012 |
|
Implementing earned value management using bridge information modeling
|
journal
|
May 2014 |
|
A model for effective implementation of Earned Value Management methodology
|
journal
|
July 2003 |
|
Project maturity in organisations
|
journal
|
August 2003 |
|
Improved cost monitoring and control through the Earned Value Management System
|
journal
|
January 2014 |
|
Management of construction cost contingency covering upside and downside risks
|
journal
|
December 2014 |
|
Earned Schedule min-max: Two new EVM metrics for monitoring and controlling projects
|
journal
|
July 2019 |
|
Integrated project delivery with BIM: An automated EVM-based approach
|
journal
|
October 2019 |
|
Z-number based earned value management (ZEVM): A novel pragmatic contribution towards a possibilistic cost-duration assessment
|
journal
|
May 2020 |
|
A multivariate approach for top-down project control using earned value management
|
journal
|
November 2015 |
|
A buffer control method for top-down project control
|
journal
|
October 2017 |
|
The impact of a limited budget on the corrective action taking process
|
journal
|
November 2020 |
|
A comparison of the performance of various project control methods using earned value management systems
|
journal
|
April 2015 |
|
A comparative study of Artificial Intelligence methods for project duration forecasting
|
journal
|
March 2016 |
|
An extension of the EVM analysis for project monitoring: The Cost Control Index and the Schedule Control Index
|
journal
|
July 2011 |
|
EDM: Earned Duration Management, a new approach to schedule performance management and measurement
|
journal
|
August 2014 |
|
An Earned Schedule-based regression model to improve cost estimate at completion
|
journal
|
August 2014 |
|
Construction and evaluation framework for a real-life project database
|
journal
|
April 2015 |
|
Evaluation of deterministic state-of-the-art forecasting approaches for project duration based on earned value management
|
journal
|
October 2015 |
|
Classification of articles and journals on project control and earned value management
|
journal
|
October 2015 |
|
Improving project forecast accuracy by integrating earned value management with exponential smoothing and reference class forecasting
|
journal
|
January 2017 |
|
Extensions of earned value management: Using the earned incentive metric to improve signal quality
|
journal
|
February 2017 |
|
Conditions of success for earned value analysis in projects
|
journal
|
April 2018 |
|
Socio-technical systems: From design methods to systems engineering
|
journal
|
January 2011 |
|
Quality: The Third Element of Earned Value Management
|
journal
|
January 2015 |
|
Improving Construction Management of an Educational Center by Applying Earned Value Technique
|
journal
|
January 2011 |
|
Project Control Based on a Mutual Application of Pert and Earned Value Management Methods
|
journal
|
January 2016 |
|
What literature review is not: diversity, boundaries and recommendations
|
journal
|
May 2014 |
|
Alignment during Preproject Planning
|
journal
|
April 2001 |
|
Probabilistic Forecasting of Project Duration Using Kalman Filter and the Earned Value Method
|
journal
|
August 2010 |
|
Combination of Project Cost Forecasts in Earned Value Management
|
journal
|
November 2011 |
|
Sensitivity of Earned Value Schedule Forecasting to S-Curve Patterns
|
journal
|
July 2014 |
|
Developing a Novel Framework to Manage Schedule Contingency Using Theory of Constraints and Earned Schedule Method
|
journal
|
April 2018 |
|
Estimating Cumulative Damages due to Disruptions in Repetitive Construction
|
journal
|
November 2016 |
|
Estimated Cost at Completion: Integrating Risk into Earned Value Management
|
journal
|
March 2017 |
|
Developing a Quality-Embedded EVM Tool to Facilitate the Iron Triangle in Architectural, Construction, and Engineering Practices
|
journal
|
September 2018 |
|
Applying and Assessing Performance of Earned Duration Management Control Charts for EPC Project Duration Monitoring
|
journal
|
March 2020 |
|
Dynamic Control Thresholds for Consistent Earned Value Analysis and Reliable Early Warning
|
journal
|
September 2015 |
|
Project Completion Time and Cost Prediction Using Change Point Analysis
|
journal
|
September 2015 |
|
Probabilistic Evaluation of Cost Performance Stability in Earned Value Management
|
journal
|
January 2016 |
|
Project Duration Forecasting Using Earned Duration Management with Exponential Smoothing Techniques
|
journal
|
January 2017 |
|
Implementation of Earned Value Management in Unit-Price Payment Contracts
|
journal
|
May 2017 |
|
System Dynamics Approach for Forecasting Performance of Construction Projects
|
journal
|
January 2018 |
|
What CPI = 0.85 Really Means: A Probabilistic Extension of the Estimate at Completion
|
journal
|
March 2019 |
|
Quantifying FEED Maturity and Its Impact on Project Performance in Large Industrial Projects
|
journal
|
September 2019 |
|
Critical Factors for Improving Reliability of Project Control Metrics throughout Project Life Cycle
|
journal
|
January 2020 |
|
Integrating Corrective Actions in Project Time Forecasting Using Exponential Smoothing
|
journal
|
September 2020 |
|
Earned Value Management System State of Practice: Identifying Critical Subprocesses, Challenges, and Environment Factors of a High-Performing EVMS
|
journal
|
July 2021 |
|
EVMS for Nuclear Power Plant Construction: Variables for Theory and Implementation
|
conference
|
June 2011 |
|
An Analytic Review of Earned Value Management Studies in the Construction Industry
|
conference
|
May 2012 |
|
Integrating BIM and Earned Value Management System to Measure Construction Progress
|
conference
|
March 2018 |
|
Synthesis of Improvements to EVMS Key Parameters Representation
|
conference
|
March 2018 |
|
Risk Management and the Effects on Project Success
|
conference
|
March 2018 |
|
Earned Value Management System (EVMS) Reliability: A Review of Existing EVMS Literature
|
conference
|
November 2020 |
|
The Costs and Benefits of the Earned Value Management Process
|
journal
|
November 1998 |
|
Come back sociotechnical systems theory, all is forgiven …
|
journal
|
April 2015 |
|
Exploring earned value management in the Spanish construction industry as a pathway to competitive advantage
|
journal
|
April 2018 |
|
The Factors Affecting on Earned Value Management
|
journal
|
August 2020 |
|
Measuring the Impact of Scope Changes on Project Plan Using EVM
|
journal
|
January 2020 |
|
Earned Value Management: Transitioning from discouragement to a glimmer of hope
|
conference
|
March 2012 |
|
Navigating an earned value management validation led by NASA: A contractor's perspective and helpful hints
|
conference
|
March 2017 |
|
So you Passed an Earned Value Management Government Validation - Now What?
|
conference
|
March 2019 |
|
Using a Socio-Technical Systems Approach for a Sales Process Improvement
|
conference
|
October 2018 |
|
Recommended Steps for Thematic Synthesis in Software Engineering
|
conference
|
September 2011 |
|
Use of Earned Value Management in the UAE Construction Industry
|
conference
|
May 2016 |
|
Project Management Model: Integrating Earned Schedule, Quality, and Risk in Earned Value Management
|
conference
|
April 2019 |
|
A New Fuzzy Approach for Project Time Assessment Under Uncertain Conditions
|
conference
|
January 2019 |
Earned Scope Management: A Case of Study of Scope Performance Using COSMIC (ISO 19761) with a Real Project
- Valdes-Souto, Francisco
-
2016 Joint Conference of the International Workshop on Software Measurement and the International Conference on Software Process and Product Measurement (IWSM-MENSURA)
https://doi.org/10.1109/IWSM-Mensura.2016.019
|
conference
|
October 2016 |
|
Applying EVM in a Software Company: Benefits and Difficulties
|
conference
|
September 2013 |
|
Grey Earned Value Management: Theory and Applications
|
journal
|
December 2021 |
|
Implementation of Earned Value Management Tools in the Wendelstein 7-X Project
|
journal
|
December 2012 |
|
Scheduling simulation-based techniques for earned value management on resource-constrained schedules under delayed scenarios
|
conference
|
December 2011 |
Critical factors and Benefits in the use of Earned Value Management in construction
- Netto, Joaquim Teixeira; De Oliveira, Nylvandir Liberato Fernandes; Freitas, Andrey Pimentel Aleluia
-
Brazilian Journal of Operations & Production Management, Vol. 17, Issue 1
https://doi.org/10.14488/BJOPM.2020.007
|
journal
|
February 2020 |
|
Developing Group Leadership and Communication Skills for Monitoring evm in Project Management
|
journal
|
July 2015 |