2009 Interstate 95 Express Phase 1A Survey
Abstract
# 2009 Interstate 95 Express Phase 1A Survey The 2009 Phase 1A Survey focused on commuters using Interstate 95 express lanes between downtown Miami and the Golden Glades Interchange in Florida. Survey participants answered questions about their trip's purpose, frequency, and mode as well as demographics such as their age, race/ethnicity, and income. It also asked if and why or why not they had used Interstate 95 before and/or after the installation of two high-occupancy toll lanes, if they were satisfied with the upgrade, and about their related perceptions of safety. ## Data Collection Agency The survey was conducted by and for the Florida Department of Transportation. ## Survey Methodology The survey was conducted online in May 2009. ## Survey Records, Data, and Documentation Survey records include 9,156 participants.
- Authors:
-
- National Renewable Energy Laboratory
- Publication Date:
- DOE Contract Number:
- AC05-76RL01830
- Research Org.:
- National Renewable Energy Laboratory; Pacific Northwest National Laboratory; Idaho National Laboratory
- Sponsoring Org.:
- USDOE Office of Energy Efficiency and Renewable Energy (EERE), Transportation Office. Vehicle Technologies Office (EE-3V)
- Subject:
- 32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATION; attitudes and preferences; equity; micromobility; smartphone; travel behavior; travel modes; wearable GPS
- OSTI Identifier:
- 2574516
- DOI:
- https://doi.org/10.15483/2574516
Citation Formats
Team, TSDC. 2009 Interstate 95 Express Phase 1A Survey. United States: N. p., 2025.
Web. doi:10.15483/2574516.
Team, TSDC. 2009 Interstate 95 Express Phase 1A Survey. United States. doi:https://doi.org/10.15483/2574516
Team, TSDC. 2025.
"2009 Interstate 95 Express Phase 1A Survey". United States. doi:https://doi.org/10.15483/2574516. https://www.osti.gov/servlets/purl/2574516. Pub date:Mon Aug 04 04:00:00 UTC 2025
@article{osti_2574516,
title = {2009 Interstate 95 Express Phase 1A Survey},
author = {Team, TSDC},
abstractNote = {# 2009 Interstate 95 Express Phase 1A Survey The 2009 Phase 1A Survey focused on commuters using Interstate 95 express lanes between downtown Miami and the Golden Glades Interchange in Florida. Survey participants answered questions about their trip's purpose, frequency, and mode as well as demographics such as their age, race/ethnicity, and income. It also asked if and why or why not they had used Interstate 95 before and/or after the installation of two high-occupancy toll lanes, if they were satisfied with the upgrade, and about their related perceptions of safety. ## Data Collection Agency The survey was conducted by and for the Florida Department of Transportation. ## Survey Methodology The survey was conducted online in May 2009. ## Survey Records, Data, and Documentation Survey records include 9,156 participants.},
doi = {10.15483/2574516},
journal = {},
number = ,
volume = ,
place = {United States},
year = {Mon Aug 04 04:00:00 UTC 2025},
month = {Mon Aug 04 04:00:00 UTC 2025}
}
