DOE Data Explorer title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Utah FORGE: Daily Reports for the 2024 Stimulation of Wells 16A/16B(78)-32

Abstract

The zip file below contains daily reports produced during the spring 2024 stimulation of wells 16A/16B(78)-32 at Utah FORGE . These reports cover a period from March 29th to April 28th, 2024. They discuss the activity on the rig each day, with each report containing information on general operations, management, safety, and weather.

Authors:

  1. Energy and Geoscience Institute at the University of Utah
Publication Date:
Other Number(s):
1645
DOE Contract Number:  
EE0007080
Research Org.:
DOE Geothermal Data Repository; Energy and Geoscience Institute at the University of Utah
Sponsoring Org.:
USDOE Office of Energy Efficiency and Renewable Energy (EERE), Renewable Power Office. Geothermal Technologies Program (EE-4G)
Collaborations:
Energy and Geoscience Institute at the University of Utah
Subject:
15 GEOTHERMAL ENERGY; EGS; Utah FORGE; completion report; daily reports; energy; fracing; geothermal; management; operations; report; rig activity; safety; stimulation; weather; well 16A78-32; well 16B78-32
OSTI Identifier:
2440866
DOI:
https://doi.org/10.15121/2440866

Citation Formats

Swearingen, Leroy. Utah FORGE: Daily Reports for the 2024 Stimulation of Wells 16A/16B(78)-32. United States: N. p., 2024. Web. doi:10.15121/2440866.
Swearingen, Leroy. Utah FORGE: Daily Reports for the 2024 Stimulation of Wells 16A/16B(78)-32. United States. doi:https://doi.org/10.15121/2440866
Swearingen, Leroy. 2024. "Utah FORGE: Daily Reports for the 2024 Stimulation of Wells 16A/16B(78)-32". United States. doi:https://doi.org/10.15121/2440866. https://www.osti.gov/servlets/purl/2440866. Pub date:Sun Sep 08 04:00:00 UTC 2024
@article{osti_2440866,
title = {Utah FORGE: Daily Reports for the 2024 Stimulation of Wells 16A/16B(78)-32},
author = {Swearingen, Leroy},
abstractNote = {The zip file below contains daily reports produced during the spring 2024 stimulation of wells 16A/16B(78)-32 at Utah FORGE . These reports cover a period from March 29th to April 28th, 2024. They discuss the activity on the rig each day, with each report containing information on general operations, management, safety, and weather.},
doi = {10.15121/2440866},
journal = {},
number = ,
volume = ,
place = {United States},
year = {Sun Sep 08 04:00:00 UTC 2024},
month = {Sun Sep 08 04:00:00 UTC 2024}
}