Updated Baseline Cost Model for Hydropower (2023)
Abstract
The "Updated Baseline Cost Model (BCM) for Hydropower" is an empirical model for estimating the costs of US hydropower projects in six categories (Non-Powered Dam (NPD), New Stream Development (NSD), Canal/Conduit, Pumped Storage Hydro (PSH), Capacity Expansion, Generator Rewind). The model equations have been estimated with data on existing or planned projects obtained from various sources. NOTE: This is a macro-enabled workbook, so Excel may block it on the first opening. In that case: 1. Save the workbook to a local directory 2. Right-click on the workbook in the local directory and select “Properties” 3. Then check “Unblock” at the bottom of the “General” tab.
- Authors:
-
- Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); ORNL
- Publication Date:
- DOE Contract Number:
- AC05-00OR22725
- Research Org.:
- Oak Ridge National Laboratory (ORNL), Oak Ridge, TN (United States)
- Sponsoring Org.:
- USDOE Office of Energy Efficiency and Renewable Energy (EERE), Renewable Power Office. Water Power Technologies Office
- Subject:
- 13 HYDRO ENERGY
- OSTI Identifier:
- 1968485
- DOI:
- https://doi.org/10.21951/BCM2023/1968485
Citation Formats
Oladosu, Gbadebo, and Sasthav, Colin. Updated Baseline Cost Model for Hydropower (2023). United States: N. p., 2023.
Web. doi:10.21951/BCM2023/1968485.
Oladosu, Gbadebo, & Sasthav, Colin. Updated Baseline Cost Model for Hydropower (2023). United States. doi:https://doi.org/10.21951/BCM2023/1968485
Oladosu, Gbadebo, and Sasthav, Colin. 2023.
"Updated Baseline Cost Model for Hydropower (2023)". United States. doi:https://doi.org/10.21951/BCM2023/1968485. https://www.osti.gov/servlets/purl/1968485. Pub date:Sat Apr 01 00:00:00 EDT 2023
@article{osti_1968485,
title = {Updated Baseline Cost Model for Hydropower (2023)},
author = {Oladosu, Gbadebo and Sasthav, Colin},
abstractNote = {The "Updated Baseline Cost Model (BCM) for Hydropower" is an empirical model for estimating the costs of US hydropower projects in six categories (Non-Powered Dam (NPD), New Stream Development (NSD), Canal/Conduit, Pumped Storage Hydro (PSH), Capacity Expansion, Generator Rewind). The model equations have been estimated with data on existing or planned projects obtained from various sources. NOTE: This is a macro-enabled workbook, so Excel may block it on the first opening. In that case: 1. Save the workbook to a local directory 2. Right-click on the workbook in the local directory and select “Properties” 3. Then check “Unblock” at the bottom of the “General” tab.},
doi = {10.21951/BCM2023/1968485},
journal = {},
number = ,
volume = ,
place = {United States},
year = {Sat Apr 01 00:00:00 EDT 2023},
month = {Sat Apr 01 00:00:00 EDT 2023}
}
Save to My Library
You must Sign In or Create an Account in order to save documents to your library.
