Rural EVSE Planning and Analysis
Abstract
The dataset includes detailed anonymized public charging station usage from several rural stations on the ChargePoint and Shell Recharge Solutions (formerly Greenlots) networks situated in and around Athens, Ohio, a rural Appalachian community. Both Level 2 and DC fast charging stations are represented. Historical data in the set date back to 2019; additional data will be uploaded semiannually until the project's completion in 2023. Each charging session recorded includes information on date and time, location, charging station level, session duration, energy delivered, fuel savings, and greenhouse gas savings.
- Authors:
-
- Rural Action Sustainable Energy Solutions
- Publication Date:
- DOE Contract Number:
- AC05-76RL01830
- Research Org.:
- National Renewable Energy Laboratory; Pacific Northwest National Laboratory; Idaho National Laboratory
- Sponsoring Org.:
- USDOE Office of Energy Efficiency and Renewable Energy (EERE), Transportation Office. Vehicle Technologies Office (EE-3V)
- Subject:
- 32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATION; attitudes and preferences; automated/autonomous vehicles; charging behavior; commercial fleet vehicles; connected vehicles; electric vehicle supply equipment (EVSE); electric vehicles; light-duty vehicles; private vehicles; rural electrification; technology adoption; travel behavior
- OSTI Identifier:
- 1883197
- DOI:
- https://doi.org/10.15483/1883197
Citation Formats
Conley-Ballew, Sarah. Rural EVSE Planning and Analysis. United States: N. p., 2026.
Web. doi:10.15483/1883197.
Conley-Ballew, Sarah. Rural EVSE Planning and Analysis. United States. doi:https://doi.org/10.15483/1883197
Conley-Ballew, Sarah. 2026.
"Rural EVSE Planning and Analysis". United States. doi:https://doi.org/10.15483/1883197. https://www.osti.gov/servlets/purl/1883197. Pub date:Sat Jan 24 00:00:00 UTC 2026
@article{osti_1883197,
title = {Rural EVSE Planning and Analysis},
author = {Conley-Ballew, Sarah},
abstractNote = {The dataset includes detailed anonymized public charging station usage from several rural stations on the ChargePoint and Shell Recharge Solutions (formerly Greenlots) networks situated in and around Athens, Ohio, a rural Appalachian community. Both Level 2 and DC fast charging stations are represented. Historical data in the set date back to 2019; additional data will be uploaded semiannually until the project's completion in 2023. Each charging session recorded includes information on date and time, location, charging station level, session duration, energy delivered, fuel savings, and greenhouse gas savings.},
doi = {10.15483/1883197},
journal = {},
number = ,
volume = ,
place = {United States},
year = {Sat Jan 24 00:00:00 UTC 2026},
month = {Sat Jan 24 00:00:00 UTC 2026}
}
Save to My Library
You must Sign In or Create an Account in order to save documents to your library.
