Hydropower Licensing Timeline and Cost Dataset
Abstract
This dataset provides timeline dates, lengths, project characteristics, license characteristics, and costs of hydropower licensing and relicensing for 107 randomly selected hydropower projects that have been issued licenses since 1 October 2005. Projects included in this dataset were licensed but not necessarily constructed. These data were analyzed and presented in Chapters 3 (timeline data) and 5 (cost data) of the Levine et al. (2021) report
- Authors:
-
- Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Oak Ridge National Laboratory
- National Renewable Energy Lab. (NREL), Golden, CO (United States)
- Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)
- Publication Date:
- DOE Contract Number:
- AC05-00OR22725
- Research Org.:
- Oak Ridge National Laboratory (ORNL), Oak Ridge, TN (United States)
- Sponsoring Org.:
- USDOE Office of Energy Efficiency and Renewable Energy (EERE), Renewable Power Office. Water Power Technologies Office
- Subject:
- 13 HYDRO ENERGY
- OSTI Identifier:
- 1826526
- DOI:
- https://doi.org/10.21951/Regulatory/1826526
Citation Formats
Pracheil, Brenda, Levine, Aaron, Aldrovandi, Mathew, and Cruce, Jesse. Hydropower Licensing Timeline and Cost Dataset. United States: N. p., 2021.
Web. doi:10.21951/Regulatory/1826526.
Pracheil, Brenda, Levine, Aaron, Aldrovandi, Mathew, & Cruce, Jesse. Hydropower Licensing Timeline and Cost Dataset. United States. doi:https://doi.org/10.21951/Regulatory/1826526
Pracheil, Brenda, Levine, Aaron, Aldrovandi, Mathew, and Cruce, Jesse. 2021.
"Hydropower Licensing Timeline and Cost Dataset". United States. doi:https://doi.org/10.21951/Regulatory/1826526. https://www.osti.gov/servlets/purl/1826526. Pub date:Fri Oct 01 00:00:00 EDT 2021
@article{osti_1826526,
title = {Hydropower Licensing Timeline and Cost Dataset},
author = {Pracheil, Brenda and Levine, Aaron and Aldrovandi, Mathew and Cruce, Jesse},
abstractNote = {This dataset provides timeline dates, lengths, project characteristics, license characteristics, and costs of hydropower licensing and relicensing for 107 randomly selected hydropower projects that have been issued licenses since 1 October 2005. Projects included in this dataset were licensed but not necessarily constructed. These data were analyzed and presented in Chapters 3 (timeline data) and 5 (cost data) of the Levine et al. (2021) report},
doi = {10.21951/Regulatory/1826526},
journal = {},
number = ,
volume = ,
place = {United States},
year = {Fri Oct 01 00:00:00 EDT 2021},
month = {Fri Oct 01 00:00:00 EDT 2021}
}
Save to My Library
You must Sign In or Create an Account in order to save documents to your library.
