Utah FORGE: Well 16A(78)-32 Planned Trajectory
Abstract
This submission includes an Excel spreadsheet containing the Utah FORGE deep well 16A(78)-32 planned trajectory including UTM coordinates, elevations, and depths from the well head to the toe. This proposed new injection well is expected to descend vertically to a depth of approximately 1810 m and then extend laterally at an angle to a MD of approximately 3290 m and a maximum vertical depth of approximately 2584 m. There is approximately 1500 m of basin fill at the well head, and less than that above the simulation region with the targeted reservoir region fully enclosed in granitoid basement. The last 60 m of the well will be open hole. Drilling is planned for October 2020. Please direct questions to the Utah FORGE team: utahforge@utah.edu and check the Utah FORGE website: https://utahforge.com after October for more information.
- Authors:
- Publication Date:
- Other Number(s):
- 1216
- DOE Contract Number:
- EE0007080
- Research Org.:
- USDOE Geothermal Data Repository (United States); Idaho National Lab. (INL), Idaho Falls, ID (United States)
- Sponsoring Org.:
- USDOE Office of Energy Efficiency and Renewable Energy (EERE), Geothermal Technologies Program (EE-2C)
- Collaborations:
- Idaho National Laboratory
- Subject:
- 15 Geothermal Energy
- Keywords:
- geothermal; energy; well 16A78-32; Utah FORGE; FORGE; well 16A78-32 trajectory; 16A78-32 well plan; well data; trajectory; EGS; geospatial data; planned; depth; location; well location; 16A78-32; injection; injection test
- Geolocation:
- 38.5148,-112.879748|38.483935,-112.879748|38.483935,-112.916367|38.5148,-112.916367|38.5148,-112.879748
- OSTI Identifier:
- 1632156
- DOI:
- https://doi.org/10.15121/1632156
- Project Location:
-
Citation Formats
Podgorney, Rob. Utah FORGE: Well 16A(78)-32 Planned Trajectory. United States: N. p., 2020.
Web. doi:10.15121/1632156.
Podgorney, Rob. Utah FORGE: Well 16A(78)-32 Planned Trajectory. United States. doi:https://doi.org/10.15121/1632156
Podgorney, Rob. 2020.
"Utah FORGE: Well 16A(78)-32 Planned Trajectory". United States. doi:https://doi.org/10.15121/1632156. https://www.osti.gov/servlets/purl/1632156. Pub date:Tue Mar 24 00:00:00 EDT 2020
@article{osti_1632156,
title = {Utah FORGE: Well 16A(78)-32 Planned Trajectory},
author = {Podgorney, Rob},
abstractNote = {This submission includes an Excel spreadsheet containing the Utah FORGE deep well 16A(78)-32 planned trajectory including UTM coordinates, elevations, and depths from the well head to the toe. This proposed new injection well is expected to descend vertically to a depth of approximately 1810 m and then extend laterally at an angle to a MD of approximately 3290 m and a maximum vertical depth of approximately 2584 m. There is approximately 1500 m of basin fill at the well head, and less than that above the simulation region with the targeted reservoir region fully enclosed in granitoid basement. The last 60 m of the well will be open hole. Drilling is planned for October 2020. Please direct questions to the Utah FORGE team: utahforge@utah.edu and check the Utah FORGE website: https://utahforge.com after October for more information.},
doi = {10.15121/1632156},
journal = {},
number = ,
volume = ,
place = {United States},
year = {Tue Mar 24 00:00:00 EDT 2020},
month = {Tue Mar 24 00:00:00 EDT 2020}
}