Title: Risk Management Plan and Risk Register for Design Low-Power Wave Energy Converter for Non-Grid Applications

Abstract

Risk Registers for major subsystems completed according to the methodology described in the Risk Management Plan [DE-EE0008627 D1.2 Risk Management Plan PD v1.1 07-19-2019.pdf], also included here.

Authors:
Publication Date:
Other Number(s):
312
DOE Contract Number:  
EE0008627
Research Org.:
Marine and Hydrokinetic Data Repository (MHKDR); Columbia Power Technologies, Inc.
Sponsoring Org.:
USDOE Office of Energy Efficiency and Renewable Energy (EERE), Wind and Water Technologies Office (EE-4W)
Collaborations:
Columbia Power Technologies, Inc.
Subject:
16 Tidal and Wave Power
Keywords:
MHK; Marine; Renewables; wave energy converter; Risk Register; Operation; Maintenance; Cost Reduction; Wave energy; Wave; failure modes; Effects; criticlity analysis; FMECA; Low-Power WEC; Risk Management; Non-Grid Applications; low-power wave energy converter
Geolocation:
44.51097499112, -123.27001333237
OSTI Identifier:
1557617
DOI:
https://doi.org/10.15473/1557617
Project Location:


Citation Formats

Amon, Ean. Risk Management Plan and Risk Register for Design Low-Power Wave Energy Converter for Non-Grid Applications. United States: N. p., 2019. Web. doi:10.15473/1557617.
Amon, Ean. Risk Management Plan and Risk Register for Design Low-Power Wave Energy Converter for Non-Grid Applications. United States. doi:https://doi.org/10.15473/1557617
Amon, Ean. 2019. "Risk Management Plan and Risk Register for Design Low-Power Wave Energy Converter for Non-Grid Applications". United States. doi:https://doi.org/10.15473/1557617. https://www.osti.gov/servlets/purl/1557617. Pub date:Fri Jul 19 00:00:00 EDT 2019
@article{osti_1557617,
title = {Risk Management Plan and Risk Register for Design Low-Power Wave Energy Converter for Non-Grid Applications},
author = {Amon, Ean},
abstractNote = {Risk Registers for major subsystems completed according to the methodology described in the Risk Management Plan [DE-EE0008627 D1.2 Risk Management Plan PD v1.1 07-19-2019.pdf], also included here.},
doi = {10.15473/1557617},
journal = {},
number = ,
volume = ,
place = {United States},
year = {Fri Jul 19 00:00:00 EDT 2019},
month = {Fri Jul 19 00:00:00 EDT 2019}
}