Title: Centipod WEC, Advanced Controls, Baseline LCOE

Abstract

Project baseline levelized cost of energy (LCOE) model for the Centipod WEC containing annual energy production (AEP) data, a cost breakdown structure (CBS), model documentation, and the LCOE content model. This baseline was built for comparison with the resultant LCOE model, built after implementation of the model predictive control (MPC) controller.

Authors:
Publication Date:
Other Number(s):
70
DOE Contract Number:  
EE0006404
Research Org.:
Marine and Hydrokinetic Data Repository (MHKDR); Dehlsen Associates, LLC
Sponsoring Org.:
USDOE Office of Energy Efficiency and Renewable Energy (EERE), Renewable Power Office. Water Power Technologies Office (EE-4WP)
Collaborations:
Dehlsen Associates, LLC
Subject:
16 Tidal and Wave Power
Keywords:
MHK; Marine; Hydrokinetic; energy; power; Wave; WEC; LCOE; AEP; MPC; Controls; Northern California; wave energy; converter; levelized cost of energy; cost of energy; economics; multiple; point; absorber; cost; point absorber; Centipod; annual energy production; model predictive control; cost breakdown structure; CBS; multi-pod; point absorber buoy; Dehlsen; advanced; baseline
Geolocation:
83.0,180.0|-83.0,180.0|-83.0,-180.0|83.0,-180.0|83.0,180.0
OSTI Identifier:
1493766
DOI:
https://doi.org/10.15473/1493766
Project Location:


Citation Formats

McCall, Alan. Centipod WEC, Advanced Controls, Baseline LCOE. United States: N. p., 2016. Web. doi:10.15473/1493766.
McCall, Alan. Centipod WEC, Advanced Controls, Baseline LCOE. United States. doi:https://doi.org/10.15473/1493766
McCall, Alan. 2016. "Centipod WEC, Advanced Controls, Baseline LCOE". United States. doi:https://doi.org/10.15473/1493766. https://www.osti.gov/servlets/purl/1493766. Pub date:Mon Feb 15 00:00:00 EST 2016
@article{osti_1493766,
title = {Centipod WEC, Advanced Controls, Baseline LCOE},
author = {McCall, Alan},
abstractNote = {Project baseline levelized cost of energy (LCOE) model for the Centipod WEC containing annual energy production (AEP) data, a cost breakdown structure (CBS), model documentation, and the LCOE content model. This baseline was built for comparison with the resultant LCOE model, built after implementation of the model predictive control (MPC) controller.},
doi = {10.15473/1493766},
journal = {},
number = ,
volume = ,
place = {United States},
year = {Mon Feb 15 00:00:00 EST 2016},
month = {Mon Feb 15 00:00:00 EST 2016}
}