Title: Centipod WEC, Advanced Controls, Baseline LCOE

Abstract

Project baseline levelized cost of energy (LCOE) model for the Centipod WEC containing annual energy production (AEP) data, a cost breakdown structure (CBS), model documentation, and the LCOE content model. This baseline was built for comparison with the resultant LCOE model, built after implementation of the model predictive control (MPC) controller.

Authors:

  1. Dehlsen Associates, LLC
Publication Date:
Other Number(s):
70
DOE Contract Number:  
EE0006404
Research Org.:
Marine and Hydrokinetic Data Repository (MHKDR); Dehlsen Associates, LLC
Sponsoring Org.:
USDOE Office of Energy Efficiency and Renewable Energy (EERE), Renewable Power Office. Water Power Technologies Office (EE-4WP)
Collaborations:
Dehlsen Associates, LLC
Subject:
16 TIDAL AND WAVE POWER; AEP; CBS; Centipod; Controls; Dehlsen; Hydrokinetic; LCOE; MHK; MPC; Marine; Northern California; WEC; Wave; absorber; advanced; annual energy production; baseline; converter; cost; cost breakdown structure; cost of energy; economics; energy; levelized cost of energy; model predictive control; multi-pod; multiple; point; point absorber; point absorber buoy; power; wave energy
OSTI Identifier:
1493766
DOI:
https://doi.org/10.15473/1493766

Citation Formats

McCall, Alan. Centipod WEC, Advanced Controls, Baseline LCOE. United States: N. p., 2016. Web. doi:10.15473/1493766.
McCall, Alan. Centipod WEC, Advanced Controls, Baseline LCOE. United States. doi:https://doi.org/10.15473/1493766
McCall, Alan. 2016. "Centipod WEC, Advanced Controls, Baseline LCOE". United States. doi:https://doi.org/10.15473/1493766. https://www.osti.gov/servlets/purl/1493766. Pub date:Sun Feb 14 23:00:00 EST 2016
@article{osti_1493766,
title = {Centipod WEC, Advanced Controls, Baseline LCOE},
author = {McCall, Alan},
abstractNote = {Project baseline levelized cost of energy (LCOE) model for the Centipod WEC containing annual energy production (AEP) data, a cost breakdown structure (CBS), model documentation, and the LCOE content model. This baseline was built for comparison with the resultant LCOE model, built after implementation of the model predictive control (MPC) controller.},
doi = {10.15473/1493766},
journal = {},
number = ,
volume = ,
place = {United States},
year = {Sun Feb 14 23:00:00 EST 2016},
month = {Sun Feb 14 23:00:00 EST 2016}
}