Least-cost Optimal Distribution Grid Expansion (LODGE) v1
- Lawrence Berkeley National Laboratory (LBNL), Berkeley, CA (United States)
LODGE finds the least-cost portfolio of traditional distribution system upgrades to integrate new loads and behind-the-meter DERs in combination with advanced non-wire alternative (NWA) planning solutions, such as utility-owned storage and distributed PV. Working with a set of least-cost solutions per feeder/substation allows us to benchmark and compare techno-economic performance of different traditional and NWA planning solutions. An important aspect of the LODGE model is that it includes power flow operation constraints. This means that the least-cost planning solutions delivered by LODGE are technically feasible. Available projects in LODGE portfolio include: 1) feeder reconductoring; 2) transformers upgrades; 3) non-wire alternatives, such as strategic siting and sizing of storage and distributed PV; 4) voltage regulators.
- Short Name / Acronym:
- LODGE v1
- Project Type:
- Closed Source
- Site Accession Number:
- 2024-047
- Software Type:
- Scientific
- Research Organization:
- Lawrence Berkeley National Laboratory (LBNL), Berkeley, CA (United States)
- Sponsoring Organization:
- USDOEPrimary Award/Contract Number:AC02-05CH11231
- DOE Contract Number:
- AC02-05CH11231
- Code ID:
- 134364
- OSTI ID:
- code-134364
- Country of Origin:
- United States
Similar Records
Distribution Grid Impacts of Community Solar [Slides]
An automated method for least cost distribution planning
Optimal Portfolio Design of Distributed Energy Resources on Puerto Rico Distribution Feeders with Long Outages after Hurricane Maria
Technical Report
·
Fri Sep 01 00:00:00 EDT 2023
·
OSTI ID:2228583
An automated method for least cost distribution planning
Journal Article
·
Sat Mar 31 23:00:00 EST 1990
· IEEE Transactions on Power Delivery (Institute of Electrical and Electronics Engineers); (USA)
·
OSTI ID:7080881
Optimal Portfolio Design of Distributed Energy Resources on Puerto Rico Distribution Feeders with Long Outages after Hurricane Maria
Technical Report
·
Wed Jun 01 00:00:00 EDT 2022
·
OSTI ID:1884924