Behind-the-meter Infrastructure Costs for Electrification Progression (BICEP) Model
- Pacific Northwest National Laboratory (PNNL), Richland, WA (United States)
The Behind-the-meter Infrastructure Costs for Electrification Progression (BICEP) model quantifies the behind-the-meter (BTM) electrical upgrades required for decarbonization through electrification by comparing the expected change in capacity requirements from the electrification technologies to the existing capacity in distributed energy resources (DER) stock (including buildings).
- Site Accession Number:
- Battelle IPID 32973-E
- Software Type:
- Scientific
- License(s):
- BSD 2-clause "Simplified" License
- Research Organization:
- Pacific Northwest National Laboratory (PNNL), Richland, WA (United States)
- Sponsoring Organization:
- USDOEPrimary Award/Contract Number:AC05-76RL01830
- DOE Contract Number:
- AC05-76RL01830
- Code ID:
- 125350
- OSTI ID:
- code-125350
- Country of Origin:
- United States
Similar Records
Towards Non-Intrusive Real-Time Monitoring of Behind the Meter Residential Distributed Energy Resources
Building Energy Systems as Behind-the-Meter Resources for Grid Services: Intelligent load control and transactive control and coordination
Conference
·
Tue Jun 04 00:00:00 EDT 2024
·
OSTI ID:2386881
Building Energy Systems as Behind-the-Meter Resources for Grid Services: Intelligent load control and transactive control and coordination
Journal Article
·
Thu Dec 08 19:00:00 EST 2022
· IEEE Electrification Magazine
·
OSTI ID:1909796