Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

MEETING XII -- BEVATRON RESEARCH CONFERENCE -- BEVATRON OPERATION

Technical Report ·
DOI:https://doi.org/10.2172/993533· OSTI ID:993533

On February 2, the first 10 Mev proton beau was injected from the linear accelerator. Injection parameters were varied to study first turn beams with the magnet excited by a d-c generator. A few minutes after the magnetic field had been adjusted to the value calculated from magnetic measurements. the 180{sup o} beam was observed on fluorescent flags and measured with Faraday cups. During the remainder of the week several radio frequency components were installed and operated. Ground current signals in various pieces of equipment were a limitation in detecting.

Research Organization:
Ernest Orlando Lawrence Berkeley National Laboratory, Berkeley, CA (US)
Sponsoring Organization:
Physics Division
DOE Contract Number:
AC02-05CH11231
OSTI ID:
993533
Report Number(s):
UCRL-2525
Country of Publication:
United States
Language:
English

Similar Records

MEETING XVIII -- BEVATRON RESEARCH CONFERENCE -- BEVATRON OPERATION and NUCLEAR EMULSION EXPERIMENTS
Technical Report · Tue May 11 00:00:00 EDT 1954 · OSTI ID:993538

MEETING XVI -- BEVATRON RESEARCH CONFERENCE -- BEVATRON OPERATION
Technical Report · Mon Apr 12 23:00:00 EST 1954 · OSTI ID:993536

Meeting XI Bevatron Research Conference
Conference · Mon Jan 11 23:00:00 EST 1954 · OSTI ID:877344