Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Trawsfynydd Plutonium Estimate

Technical Report ·
DOI:https://doi.org/10.2172/992380· OSTI ID:992380
Report serves to document an estimate of the cumulative plutonium production of the Trawsfynydd Unit II reactor (Traws II) over its operating life made using the Graphite Isotope Ratio Method (GIRM). The estimate of the plutonium production in Traws II provided in this report has been generated under blind conditions. In other words, the estimate ofthe Traws II plutonium production has been generated without the knowledge of the plutonium production declared by the reactor operator (Nuclear Electric). The objective of this report is to demonstrate that the GIRM can be employed to serve as an accurate tool to verify weapons materials production declarations.
Research Organization:
Pacific Northwest National Laboratory (PNNL), Richland, WA (US)
Sponsoring Organization:
USDOE
DOE Contract Number:
AC05-76RL01830
OSTI ID:
992380
Report Number(s):
PNNL-13528; 400802000
Country of Publication:
United States
Language:
English

Similar Records

A Graphite Isotope Ratio Method: A Primer on Estimating Plutonium Production in Graphite Moderated Reactors
Technical Report · Wed Mar 24 23:00:00 EST 2004 · OSTI ID:15010619

Uranium Oxide Aerosol Transport in Porous Graphite
Technical Report · Sun Jan 22 19:00:00 EST 2012 · OSTI ID:1051989

How much plutonium does North Korea really have?
Conference · Fri Oct 31 23:00:00 EST 1997 · OSTI ID:548649