This note is a compilation of comments on the limitations on the Main Ring cycle time, and multi-batch operation of the Main Ring. The first page is a summary of three talks given in january 1986 by the authors about limitations to Main Ring cycle rates and the possibilities for multi-batch targeting schemes. Following this is a writeup by Stan pruss on the Main Ring cycle time limitations. This is followed in turn by some comments by G. Dugan on the general topic, from the pbar Source perspective. The basic conclusions of the talks are: (1) The main ring should be able to ramp to 120 GeV with a cycle time of less than 2.15 sec, with existing hardware. The principal limits are due to voltage limitations on the MR power supplies, both on the upgramp and on invert, and RF bucket area limitations. The magnet cooling is adequate to run at 120 GeV DC. (2) Bunch narrowing techniques for multiple batch operation, with up to 4 batches on flat top, is possible with the existing hardware and results in a very small ({approx} 3%) longitudinal emittance dilution per batch. This conclusion does not include the effects of instabilities, if any. Although the optimum bunch length with multiple batches will be wider than with one batch, this is not a large effect and probably is of no significance for the pbar yield (although this should be checked). (3) With a small modification to the existing hardware, the E17 kicker can be upgraded to allow operation with 3 batches on the flat top. Some additional effort (which is planned) will be required to allow four batches, beyond this point, major effort (not planned at present) will be required.

Research Organization:
Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States)
Sponsoring Organization:
USDOE Office of Science (SC), High Energy Physics (HEP)
DOE Contract Number:
AC02-07CH11359
OSTI ID:
984625
Report Number(s):
FERMILAB-PBAR-NOTE-453; oai:inspirehep.net:863458; TRN: US201016%%1537
Country of Publication:
United States
Language:
English

Similar Records

Kicker and Pulser Systems-Required for Pbar Manipulations in the Main Ring and Tevatron
Technical Report · Wed Feb 01 00:00:00 EST 1984 · OSTI ID:984625

Investigation of an Ultrafast Harmonic Resonant RF Kicker
Thesis/Dissertation · Sat Oct 01 00:00:00 EDT 2016 · OSTI ID:984625

Proton extraction and transport for PBAR production in Tevatron I
Conference · Tue Oct 01 00:00:00 EDT 1985 · IEEE Trans. Nucl. Sci.; (United States) · OSTI ID:984625