The 4-8 GHz Stochastic Cooling Upgrade for the Fermilab Debuncher
- Fermilab
During the Fermilab Collider Run II, the Main Injector is expected to provided a three-fold increase in flux of the proton beam sent to the antiproton production target as compared to the previous Collider Run Ib. This increase in antiproton production rate to 20 x 10{sup 10} antiprotons/hour will be handled by upgrading the stochastic cooling systems in both the Debuncher and Accumulator rings of the Fermilab Antiproton Source. In the Debuncher ring, the upgrade calls for increasing the stochastic cooling system bandwidth from 2-4 to 4-8 GHz. The effective front-end noise temperature of the cooling systems will also be lowered from 125K to 35K. This paper will discuss some details of the system design of the new 4-8 GHz cooling systems in the Debuncher Ring.
- Research Organization:
- Fermi National Accelerator Laboratory (FNAL), Batavia, IL (United States)
- Sponsoring Organization:
- USDOE Office of Science (SC), High Energy Physics (HEP) (SC-25)
- DOE Contract Number:
- AC02-07CH11359
- OSTI ID:
- 984609
- Report Number(s):
- FERMILAB-PBAR-NOTE-625; oai:inspirehep.net:863483
- Country of Publication:
- United States
- Language:
- English
Similar Records
Fast 4 to 8 GHz Debuncher betatron stochastic cooling for the Tevatron upgrade
Momentum precooling in the Debuncher ring for the Fermilab Tevatron-I project
Momentum precooling in the debuncher ring for the Fermilab Tevatron I project
Technical Report
·
Wed Jul 01 00:00:00 EDT 1987
·
OSTI ID:6036421
Momentum precooling in the Debuncher ring for the Fermilab Tevatron-I project
Conference
·
Mon Feb 28 23:00:00 EST 1983
·
OSTI ID:6053311
Momentum precooling in the debuncher ring for the Fermilab Tevatron I project
Conference
·
Mon Aug 01 00:00:00 EDT 1983
· IEEE Trans. Nucl. Sci.; (United States)
·
OSTI ID:5436251