Wind Turbine Generator System Duration Test Report for the Mariah Power Windspire Wind Turbine

Technical Report ·
DOI:https://doi.org/10.2172/981559· OSTI ID:981559
This test was conducted as part of the U.S. Department of Energy's (DOE) Independent Testing project to help reduce the barriers of wind energy expansion by providing independent testing results for small turbines. In total, five turbines are being tested at the National Wind Technology Center (NWTC) as a part of the first round of this project. Duration testing is one of up to five tests that may be performed on the turbines. Other tests include power performance, safety and function, noise, and power quality tests. NWTC testing results provide manufacturers with reports that may be used to meet part of small wind turbine certification requirements. This duration test report focuses on the Mariah Power Windspire wind turbine.
Research Organization:
National Renewable Energy Laboratory (NREL), Golden, CO.
Sponsoring Organization:
USDOE
DOE Contract Number:
AC36-08GO28308
OSTI ID:
981559
Report Number(s):
NREL/TP-500-47072
Country of Publication:
United States
Language:
English

Similar Records

Wind Turbine Safety and Function Test Report for the Mariah Windspire Wind Turbine
Technical Report · Thu Jul 01 00:00:00 EDT 2010 · OSTI ID:984984

Duration Test Report for the SWIFT Wind Turbine
Technical Report · Thu Sep 20 00:00:00 EDT 2012 · OSTI ID:1062461

Duration Test Report for the Ventera VT10 Wind Turbine
Technical Report · Sat Jun 01 00:00:00 EDT 2013 · OSTI ID:1087203