Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Design and performance of the LCLS cavity BPM system.

Conference ·

In this paper we present the design of the beam position monitor (BPM) system for the LCLS undulator, which features a high-resolution X-band cavity BPM. Each BPM has a TM{sub 010} monopole reference cavity and a TM{sub 110} dipole cavity designed to operate at a center frequency of 11.384 GHz. The signal processing electronics features a low- noise single-stage three-channel heterodyne receiver that has selectable gain and a phase locking local oscillator. We will discuss the system specifications, design, and prototype test results.

Research Organization:
Argonne National Laboratory (ANL)
Sponsoring Organization:
SC
DOE Contract Number:
AC02-06CH11357
OSTI ID:
972584
Report Number(s):
ANL/ASD/CP-59525
Country of Publication:
United States
Language:
ENGLISH

Similar Records

Design and Performance of the LCLS Cavity BPM System
Conference · Tue Jan 22 23:00:00 EST 2008 · Conf.Proc.C070625:4366,2007 · OSTI ID:922592

Cavity BPMs for the NLC
Technical Report · Fri Jun 14 00:00:00 EDT 2002 · OSTI ID:799078

A high resolution cavity BPM for the CLIC Test Facility
Conference · Sun Aug 01 00:00:00 EDT 2010 · OSTI ID:986972