Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

BPA/Puget Power Northwest Washington Transmission Project : Summary of the Supplemental Draft Environmental Statement.

Technical Report ·
DOI:https://doi.org/10.2172/97234· OSTI ID:97234
BPA and Puget Sound Power and Light (Puget Power) are proposing to upgrade the existing electric transmission power system in the Whatcom and Skagit County area of northwest Washington to increase the capacity of the US-Canada Intertie transmission system. The project would satisfy the need to provide more ability to store and return energy with Canada, would provide additional capacity on the Intertie for anticipated increases in power transactions, and would increase flexibility in operation of the US and Canadian hydroelectric system. It would protect Puget Power`s local system against thermal overloads, and improve local reliability. In November 1993, Bonneville Power Administration (BPA), and Whatcom County (Washington) published a draft environmental impact statement (DEIS) for the proposed Northwest Washington Transmission Project. In order to present some shifts in need for the project and to permit additional review, BPA and Whatcom County have elected to issue a Supplemental Draft EIS. This Summary presents background material, explains project needs and purposes, and then focuses on alternatives and the possible effects.
Research Organization:
USDOE Bonneville Power Administration, Portland, OR (United States); Whatcom, County of, WA (United States)
Sponsoring Organization:
USDOE, Washington, DC (United States)
OSTI ID:
97234
Report Number(s):
DOE/BP-2565; ON: DE95014438; NC: None; DOE/EIS-0173
Country of Publication:
United States
Language:
English