Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Counter-Rotating Tandem Motor Drilling System

Technical Report ·
DOI:https://doi.org/10.2172/970600· OSTI ID:970600
 [1]
  1. Institute Of Gas Technology

Gas Technology Institute (GTI), in partnership with Dennis Tool Company (DTC), has worked to develop an advanced drill bit system to be used with microhole drilling assemblies. One of the main objectives of this project was to utilize new and existing coiled tubing and slimhole drilling technologies to develop Microhole Technology (MHT) so as to make significant reductions in the cost of E&P down to 5000 feet in wellbores as small as 3.5 inches in diameter. This new technology was developed to work toward the DOE's goal of enabling domestic shallow oil and gas wells to be drilled inexpensively compared to wells drilled utilizing conventional drilling practices. Overall drilling costs can be lowered by drilling a well as quickly as possible. For this reason, a high drilling rate of penetration is always desired. In general, high drilling rates of penetration (ROP) can be achieved by increasing the weight on bit and increasing the rotary speed of the bit. As the weight on bit is increased, the cutting inserts penetrate deeper into the rock, resulting in a deeper depth of cut. As the depth of cut increases, the amount of torque required to turn the bit also increases. The Counter-Rotating Tandem Motor Drilling System (CRTMDS) was planned to achieve high rate of penetration (ROP) resulting in the reduction of the drilling cost. The system includes two counter-rotating cutter systems to reduce or eliminate the reactive torque the drillpipe or coiled tubing must resist. This would allow the application of maximum weight-on-bit and rotational velocities that a coiled tubing drilling unit is capable of delivering. Several variations of the CRTDMS were designed, manufactured and tested. The original tests failed leading to design modifications. Two versions of the modified system were tested and showed that the concept is both positive and practical; however, the tests showed that for the system to be robust and durable, borehole diameter should be substantially larger than that of slim holes. As a result, the research team decided to complete the project, document the tested designs and seek further support for the concept outside of the DOE.

Research Organization:
Institute Of Gas Technology
Sponsoring Organization:
USDOE
DOE Contract Number:
FC26-05NT15489
OSTI ID:
970600
Country of Publication:
United States
Language:
English

Similar Records

Evaluation of Microhole Drilling Technology for Geothermal Exploration, Assessment, And Monitoring
Technical Report · Thu Apr 01 00:00:00 EDT 2021 · OSTI ID:1832088

HIGH-POWER TURBODRILL AND DRILL BIT FOR DRILLING WITH COILED TUBING
Technical Report · Mon Mar 31 00:00:00 EDT 2008 · OSTI ID:1030554

Proper bit selection improves ROP in coiled tubing drilling
Journal Article · Mon Apr 18 00:00:00 EDT 1994 · Oil and Gas Journal; (United States) · OSTI ID:5075402