Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Operation of the RF Controls in the CEBAF Injector

Conference ·
OSTI ID:954149

The CEBAF injector has produced its first relativistic beam with two superconducting cavities.Six RF control modules are used to control amplitude and phase in the chopper cavities, the buncher, the capture section, and the two superconducting cavities.In this paper the required stability and actual performance of the modules are discussed.For the superconducting cavity control, performance is consistent with energy stability of ~ 10^-4.

Research Organization:
Thomas Jefferson Lab National Accelerator Facility
Sponsoring Organization:
USDOE
DOE Contract Number:
AC05-84ER40150
OSTI ID:
954149
Report Number(s):
CEBAF-PR-90-04; DOE/ER/40150-137
Country of Publication:
United States
Language:
English

Similar Records

Operation of the rf controls in the CEBAF injector
Technical Report · Fri Jun 01 00:00:00 EDT 1990 · OSTI ID:6631092

Embedded Software for the CEBAF RF Control Module
Conference · Wed May 01 00:00:00 EDT 1991 · OSTI ID:954207

Status of the CEBAF Injector
Conference · Sat Oct 01 00:00:00 EDT 1988 · OSTI ID:954126