Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Transport of DESY 1.3 GHZ Cryomodule at Fermilab

Conference ·
OSTI ID:952633

In an exchange of technology agreement, Deutsches Elektron-Synchrotron (DESY) Laboratory in Hamburg Germany has provided a 1.3 GHz cryomodule 'kit' to Fermilab. The cryomodule components (qualified dressed cavities, cold mass parts, vacuum vessel, etc.) sent from Germany in pieces were assembled at Fermilab's Cryomodule Assembly Facility (CAF). The cavity string was assembled at CAF-MP9 Class 10 cleanroom and then transported to CAF-ICB cold mass assembly area via a flatbed air ride truck. Finite Element Analysis (FEA) studies were implemented to define location of instrumentation for initial cold mass transport, providing modal frequencies and shapes. Subsequently, the fully assembled cryomodule was transported to the SRF Accelerator Test Facility at New Muon Lab (NML). Internal geophones (velocity sensors) were attached during the coldmass assembly for transport (warm) and operational (cold) measurements. A description of the isolation system that maintained alignment during transport and protected fragile components is provided. Shock and vibration measurement results of each transport and modal analysis are discussed.

Research Organization:
Fermi National Accelerator Laboratory (FNAL), Batavia, IL
Sponsoring Organization:
USDOE
DOE Contract Number:
AC02-07CH11359
OSTI ID:
952633
Report Number(s):
FERMILAB-CONF-09-082-AD-TD
Country of Publication:
United States
Language:
English

Similar Records

Transatlantic Transport of Fermilab 3.9 GHZ Cryomodule to DESY
Conference · Fri May 01 00:00:00 EDT 2009 · OSTI ID:952632

Transatlantic transport of Fermilab 3.9 GHz cryomodule for TTF/FLASH to DESY
Conference · Sun Jun 01 00:00:00 EDT 2008 · Conf.Proc.C0806233:mopp022,2008 · OSTI ID:935249

Transport of LCLS-II 1.3 Ghz cryomodule to SLAC
Conference · Thu Jun 30 00:00:00 EDT 2016 · OSTI ID:1264030