Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Optimization of integrated luminosity in the Tevatron

Conference ·
OSTI ID:952265
We present the strategy which has been used recently to optimize the performance of the Fermilab Tevatron proton-antiproton collider. We use a relatively simple heuristic model based on the antiproton production rate, which optimizes the number of antiprotons in a store in order to maximize the integrated luminosity. A store is terminated as soon as the target number of antiprotons is reached and the Tevatron quickly resets to load another store. Since this procedure was implemented, the integrated luminosity has improved by {approx} 35%. Other recent operational improvements include decreasing the shot setup time, and reducing beam-beam effects by making the proton and antiproton brightness more compatible, for example by scraping protons to smaller emittances.
Research Organization:
Fermi National Accelerator Laboratory (FNAL), Batavia, IL
Sponsoring Organization:
USDOE
DOE Contract Number:
AC02-07CH11359
OSTI ID:
952265
Report Number(s):
FERMILAB-CONF-09-132-AD
Country of Publication:
United States
Language:
English

Similar Records

Optimization of Integrated Luminosity of the Fermilab Tevatron Collider
Conference · Thu Oct 01 00:00:00 EDT 2009 · OSTI ID:965903

Analytical Description of Tevatron Integrated Luminosity
Conference · Wed Apr 01 00:00:00 EDT 2009 · OSTI ID:952252

An analytical approach to understanding Tevatron integrated luminosity
Technical Report · Tue May 01 00:00:00 EDT 2007 · OSTI ID:908837