System Description for the K-25/K-27 D&D Project Polyurethane Foam Delivery System, East Tennessee Technology Park, Oak Ridge, Tennessee
The Foam Delivery System used in the decontamination and decommissioning (D&D) project for the K-25/K-27 Buildings at the East Tennessee Technology Park (ETTP) is comprised of a trailer-mounted Gusmer{reg_sign} H20/35 Pro-TEC Proportioning Unit and the associated equipment to convey electrical power, air, and foam component material to the unit. This high-pressure, plural-component polyurethane foam pouring system will be used to fill process gas and non-process equipment/piping (PGE/P) within the K-25/K-27 Buildings with polyurethane foam to immobilize contaminants prior to removal. The system creates foam by mixing isocyanate and polyol resin (Resin) component materials. Currently, the project plans to utilize up to six foaming units simultaneously during peak foaming activities. Also included in this system description are the foam component material storage containers that will be used for storage of the component material drums in a staging area outside of the K-25/K-27 Buildings. The Foam Delivery System and foam component material storage enclosures (i.e., Foaming Component Protective Enclosures) used to store polymeric methylene diphenyl diisocyanate (PMDI) component material are identified as Safety Significant (SS) Structures, Systems and Components (SSC) in the Documented Safety Analysis (DSA) for the project, Documented Safety Analysis for the K-25 and K-27 Facilities at the East Tennessee Technology Park, Oak Ridge, Tennessee, DSA-ET-K-25/K-27-0001.
- Research Organization:
- East Tennessee Technology Park (ETTP), Oak Ridge, TN
- Sponsoring Organization:
- USDOE Assistant Secretary for Environmental Management (EM)
- DOE Contract Number:
- AC05-98OR22700
- OSTI ID:
- 949986
- Report Number(s):
- BJC/OR-2171 R4
- Country of Publication:
- United States
- Language:
- English
Similar Records
Environmental Management Waste Management Facility Proxy Waste Lot Profile 6.999 for Building K-25 West Wing, East Tennessee Technology Park, Oak Ridge, Tennessee
Impact of NDA Uncertainites on NCS at the K-25 Site
Deactivation of the K-27 building at the east Tennessee Technology Park - 15554
Technical Report
·
Wed Feb 11 23:00:00 EST 2009
·
OSTI ID:964677
Impact of NDA Uncertainites on NCS at the K-25 Site
Conference
·
Thu May 29 00:00:00 EDT 2008
·
OSTI ID:949985
Deactivation of the K-27 building at the east Tennessee Technology Park - 15554
Conference
·
Wed Jul 01 00:00:00 EDT 2015
·
OSTI ID:22824429