Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Final Report Recommended Actions to Reduce Electrical Peak Loads at the Marine Corps Air Station at Camp Pendleton, California

Technical Report ·
DOI:https://doi.org/10.2172/949181· OSTI ID:949181

PNNL conducted a walk-through audit of Marine Corps Air Station at Camp Pendleton. The audit inspected a significant portion of the site and identified a large number of similar energy saving opportunities across all building types.

Research Organization:
Pacific Northwest National Laboratory (PNNL), Richland, WA (US)
Sponsoring Organization:
USDOE
DOE Contract Number:
AC05-76RL01830
OSTI ID:
949181
Report Number(s):
PNNL-13544; EL1702000
Country of Publication:
United States
Language:
English