Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

PROMPT DOSE ANALYSIS FOR THE NATIONAL IGNITION FACILITY

Conference ·
OSTI ID:945759
Detailed 3-D modeling of the NIF facility is developed to accurately understand the prompt radiation environment within NIF. Prompt dose values are calculated for different phases of NIF operation. Results of the analysis were used to determine the final thicknesses of the Target Bay (TB) and secondary doors as well as the required shield thicknesses for all unused penetrations. Integrated dose values at different locations within the facility are needed to formulate the personnel access requirements within different parts of the facility. The conclusions of this presentation are: (1) The current NIF facility model includes all important features of the Target Chamber, shielding system, and building configuration; (2) All shielding requirements for Phase I operation are met; (3) Negligible dose values (a fraction of mrem) are expected in normally occupied areas during Phase I; (4) In preparation for the Ignition Campaign and Phase IV of operation, all primary and secondary shield doors will be installed; (5) Unused utility penetrations in the Target Bay and Switchyard walls ({approx}50%) will be shielded by 1 foot thick concrete to reduce prompt dose inside and outside the NIF facility; (6) During Phase IV, a 20 MJ shot will produce acceptable dose levels in the occupied areas as well as at the nearest site boundary; (7) A comprehensive radiation monitoring plan will be put in place to monitor dose values at large number of locations; and (8) Results of the dose monitoring will be used to modify personnel access requirements if needed.
Research Organization:
Lawrence Livermore National Laboratory (LLNL), Livermore, CA
Sponsoring Organization:
USDOE
DOE Contract Number:
W-7405-ENG-48
OSTI ID:
945759
Report Number(s):
LLNL-CONF-407219
Country of Publication:
United States
Language:
English