PVUSA: The value of photovoltaics in the distribution system. The Kerman Grid-Support Project

Technical Report ·
DOI:https://doi.org/10.2172/93996· OSTI ID:93996
;  [1]
  1. Pacific Energy Group, Walnut Creek, CA (United States)
As part of the Photovoltaics for Utility Scale Applications Applications (PVUSA) Project Pacific Gas Electric Company (PG&E) built the Kerman 500-kW photovoltaic power plant. Located near the end of a distribution feeder in a rural section of Fresno County, the plant was not built so much to demonstrate PV technology, but to evaluate its interaction with the local distribution grid and quantify available nontraditional grid-support benefits (those other than energy and capacity). As demand for new generation began to languish in the 1980s, and siting and permitting of power plants and transmission lines became more involved, utilities began considering smaller, distributed power sources. Potential benefits include shorter construction lead time, less capital outlay, and better utilization of existing assets. The results of a PG&E study in 1990/1991 of the benefits from a PV system to the distribution grid prompted the PVUSA Project to construct a plant at Kerman. Completed in 1993, the plant is believed to be the first one specifically built to evaluate the multiple benefits to the grid of a strategically sited plant. Each of nine discrete benefits were evaluated in detail by first establishing the technical impact, then translating the results into present economic value. Benefits span the entire system from distribution feeder to the generation fleet. This work breaks new ground in evaluation of distributed resources, and suggests that resource planning practices be expanded to account for these non-traditional benefits.
Research Organization:
Pacific Gas and Electric Co., Davis, CA (United States)
Sponsoring Organization:
USDOE, Washington, DC (United States); Electric Power Research Inst., Palo Alto, CA (United States); California Energy Resources Conservation and Development Commission, Sacramento, CA (United States)
DOE Contract Number:
FC04-92AL82993
OSTI ID:
93996
Report Number(s):
DOE/AL/82993--20; ON: DE95014344
Country of Publication:
United States
Language:
English

Similar Records

The value of distributed generation: The PVUSA grid-support project serving Kerman Substation. Interim report, April 1994
Technical Report · Fri Jul 01 00:00:00 EDT 1994 · OSTI ID:81028

Photovoltaic balance-of-system designs and costs at PVUSA
Technical Report · Mon May 01 00:00:00 EDT 1995 · OSTI ID:83805

PVUSA instrumentation and data analysis techniques for photovoltaic systems
Technical Report · Sun Oct 01 00:00:00 EDT 1995 · OSTI ID:125070