Publications desktop survival guide
Purpose of this guide is to document and simplify the writing, reviewing, and production process for the Uranium Mill Tailings Remedial Action (UMTRA) Project Technical Assistance Contractor (TAC) staff and to provide specific answers concerning the content, style, and format of UMTRA Project documents. Goal of the UMTRA Project document preparation process is to deliver to the US DOE high-quality documents that meet requirements (meets expressed client needs; accurate and consistent technical content; clear writing; well organized document; consistent style). A document review process has been established to ensure that TAC documents are accurate, consistent, and well organized. The editing process applies standard rules for style and format, spelling, grammar, punctuation, and sentence structure to make the document consistent and easier to read. This guide sets forth the rules to be applied to UMTRA Project documents.
- Research Organization:
- Jacobs Engineering Group, Inc., Albuquerque, NM (United States)
- Sponsoring Organization:
- USDOE, Washington, DC (United States)
- DOE Contract Number:
- AC04-91AL62350
- OSTI ID:
- 93529
- Report Number(s):
- DOE/AL/62350--12; ON: DE95016207
- Country of Publication:
- United States
- Language:
- English
Similar Records
Style guide for oil and gas professionals
CTD Writing and Editing Standards
UMTRA project technical assistance contractor quality assurance implementation plan for surface and ground water
Book
·
Mon Dec 31 23:00:00 EST 1984
·
OSTI ID:6367366
CTD Writing and Editing Standards
Technical Report
·
Thu Feb 28 23:00:00 EST 1991
·
OSTI ID:5895954
UMTRA project technical assistance contractor quality assurance implementation plan for surface and ground water
Technical Report
·
Thu Sep 01 00:00:00 EDT 1994
·
OSTI ID:10188730