Post-processing V&V level II ASC milestone (2360) results.
The 9/30/2007 ASC Level 2 Post-Processing V&V Milestone (Milestone 2360) contains functionality required by the user community for certain verification and validation tasks. These capabilities include loading of edge and face data on an Exodus mesh, run-time computation of an exact solution to a verification problem, delivery of results data from the server to the client, computation of an integral-based error metric, simultaneous loading of simulation and test data, and comparison of that data using visual and quantitative methods. The capabilities were tested extensively by performing a typical ALEGRA HEDP verification task. In addition, a number of stretch criteria were met including completion of a verification task on a 13 million element mesh.
- Research Organization:
- Sandia National Laboratories
- Sponsoring Organization:
- USDOE
- DOE Contract Number:
- AC04-94AL85000
- OSTI ID:
- 933216
- Report Number(s):
- SAND2007-6006
- Country of Publication:
- United States
- Language:
- English
Similar Records
Post-processing V&V Level II ASC Milestone (2843) results.
Code Verification Capabilities and Assessments in Support of ASC V&V Level 2 Milestone #6035
ASC-AD penetration modeling FY05 status report.
Technical Report
·
Wed Oct 01 00:00:00 EDT 2008
·
OSTI ID:941404
Code Verification Capabilities and Assessments in Support of ASC V&V Level 2 Milestone #6035
Technical Report
·
Tue Sep 26 00:00:00 EDT 2017
·
OSTI ID:1394946
ASC-AD penetration modeling FY05 status report.
Technical Report
·
Fri Mar 31 23:00:00 EST 2006
·
OSTI ID:881628