The Cygnus Dual Beam Radiographic Facility consists of two identical radiographic sources - Cygnus 1 and Cygnus 2. Each source has the following x-ray output: 1-mm diameter spot size, 4 rad at 1 m, 50-ns Full Width Half Max. The diode pulse has the following electrical specifications: 2.25 MV, 60 kA, 60 ns. This Radiographic Facility is located in an underground tunnel test area at the Nevada Test Site (NTS). The sources were developed to produce high-resolution images on subcritical tests which are performed at NTS. Subcritical tests are single-shot, high-value events. For this application, it is desirable to maintain a high level of reproducibility in source output. The major components of the Cygnus machines are: Marx generator, water-filled pulse–forming line (PFL), water-filled coaxial transmission line, three-cell inductive voltage adder, and rod-pinch diode. A primary source of fluctuation in Cygnus shot-to-shot performance is jitter in breakdown of the main PFL switch, which is a “self-break” switch. The PFL switch breakdown time determines the peak PFL charging voltage, which ultimately affects the diode pulse. Therefore, PFL switch jitter contributes to shot-to-shot variation in source endpoint energy and dose. In this paper we will present PFL switch jitter analysis for both Cygnus machines and give the correlation with diode performance. For this analysis the PFL switch on each machine was maintained at a single gap setting which has been used for the majority of shots at NTS. In addition to this analysis, PFL switch performance for different switch gap settings taken recently will be examined. Lastly, implications of source jitter for radiographic diagnosis of subcritical shots will be discussed.

Research Organization:
National Security Technologies, LLC
Sponsoring Organization:
USDOE - National Nuclear Security Administration (NNSA)
DOE Contract Number:
AC52-06NA25946
OSTI ID:
926255
Report Number(s):
DOE/NV/25946--111
Country of Publication:
United States
Language:
English

Similar Records

Cygnus PFL Switch Jitter
Conference · Sat Jul 21 00:00:00 EDT 2007 · Pulsed Power Plasma Science, 2007, PPPS 2007 · OSTI ID:926638

Radiographic X-Ray Pulse Jitter
Conference · Fri Jan 14 23:00:00 EST 2011 · OSTI ID:1030663

Cygnus Diverter Switch Analysis
Conference · Thu Jan 31 23:00:00 EST 2008 · OSTI ID:926632