The ILC engineering design phase: Towards the production of an engineering design report
Journal Article
·
· ICFA Beam Dyn.Newslett.43:12-14,2007
OSTI ID:922056
In August 2007, the International Linear Collider-Global Design Effort (ILC-GDE) published the ILC Reference Design Report (RDR) which contains a description of the design of the linear collider and a ''value'' cost estimate. The RDR was developed over a 2 year period starting in August 2005 with the creation of the GDE at the Second ILC workshop, held at Snowmass, Colorado. The design described in the RDR and its associated estimate allow the GDE to plan and prioritize the next phase of the ILC, the creation of an Engineering Design and the production, by mid 2010, of an Engineering Design Report (EDR). The EDR will contain, in addition to a more mature design and an updated value estimate, a plan for executing the ILC Project. The purpose of the EDR is to facilitate formal international negotiations at government level on siting, funding, organization and execution of the ILC project with a timescale consistent with the start of construction in 2012. The creation of the ILC Engineering Design will include: (1) Basic R&D to demonstrate that all components can be engineered; (2) R&D into alternative solutions to mitigate remaining risk; (3) An overall design to allow machine construction to start within 3 years following its completion; (4) selection between high tech options to allow industrialization efforts; (5) A comprehensive value-engineering exercise; (6) A complete value cost estimate for the machine, including a funding profile consistent with the project schedule; (7) A project execution plan including a realistic schedule; (8) Designs for facilities shared between different ''area systems'', and for site-specific infrastructure. The designs must include the level of detail needed for regions to estimate the cost to host; and (9) All necessary information must be provided to regions to evaluate project technical and financial risks in support of a bid to host. With the completion of the EDR, the ILC-GDE leadership will be able to seek approval of the ILC project from governmental agencies.
- Research Organization:
- Fermi National Accelerator Laboratory (FNAL), Batavia, IL
- Sponsoring Organization:
- USDOE
- DOE Contract Number:
- AC02-07CH11359
- OSTI ID:
- 922056
- Report Number(s):
- FERMILAB-PUB-07-685-TD
- Journal Information:
- ICFA Beam Dyn.Newslett.43:12-14,2007, Journal Name: ICFA Beam Dyn.Newslett.43:12-14,2007 Vol. 43
- Country of Publication:
- United States
- Language:
- English
Similar Records
ILC Reference Design Report: Accelerator Executive Summary
ILC Reference Design And Challenges
Beam Dynamics Challenges for the ILC
Journal Article
·
Thu Dec 13 23:00:00 EST 2007
· ICFA Beam Dyn.Newslett.42:7-29,2007
·
OSTI ID:921010
ILC Reference Design And Challenges
Conference
·
Mon Jul 06 00:00:00 EDT 2009
· Conf.Proc.C070625:1944,2007
·
OSTI ID:958659
Beam Dynamics Challenges for the ILC
Journal Article
·
Tue Feb 12 23:00:00 EST 2008
· ICFA Beam Dyn.Newslett.44:13-35,2007
·
OSTI ID:923766